SG / Sweetgreen, Inc. - Aliran Opsi Saham
Pasar opsi dianggap sebagai uang pintar, dan dengan memantau perdagangan opsi yang dilakukan, kita dapat mengidentifikasi sinyal bullish atau bearish. Produk aliran opsi Fintel mendapatkan data perdagangan hampir secara real-time dan menyaringnya untuk menampilkan perdagangan blok besar yang kemungkinan besar dilakukan oleh lembaga. Dengan mengamati PEMBUKAAN posisi CALL atau PUT besar, kita bisa mendapatkan indikator sentimen hampir secara real-time.
Lihat juga: Papan Peringkat Saham kami dan Papan Peringkat ETF kami.
- O--|---
- Traded below bid (sold)
- -O-|---
- Traded on the bid (sold)
- --O|---
- Traded between mid and bid (sold)
- ---O---
- Traded at mid market
- ---|O--
- Traded between mid and ask/offer (bought)
- ---|-O-
- Traded on the ask/offer (bought)
- ---|--O
- Traded above ask/offer (bought)
- Premium Sigmas
- Premium Sigmas is the number of standard deviations of the premium from the mean. Any standard deviation above 2 (two) indicates a premium size that is a significant deviation from the norm (ie, extraordinary large), and we highlight it in bold.
Date | Time | Symbol | Trade Side |
Side | Contract | Expiry | DTX | Strike Price |
Spot Price |
Strike / Spot % |
Cond | Event | Trade | Open Int | IVOL | Premium Paid ($) |
Premium Sigmas |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2025-09-05 | 15:40:19 | SG | SELL |
|
PUT | 2026-01-16 | 133 | 5 | 8.895 | -43.79 | MULTI-SWEEP | 3503 | 0.90 | 7,278 | -0.45 | ||
2025-09-05 | 11:21:08 | SG | 2026-04-17 | 224 | 8.865 | ||||||||||||
2025-09-05 | 10:30:31 | SG | 2025-10-10 | 35 | 8.89523 | ||||||||||||
2025-09-05 | 10:04:14 | SG | 2026-01-16 | 133 | 9.02 | ||||||||||||
2025-09-05 | 10:04:14 | SG | 2026-01-16 | 133 | 9.02 | ||||||||||||
2025-09-03 | 14:17:25 | SG | 2025-10-03 | 30 | 8.965 | ||||||||||||
2025-09-03 | 12:48:57 | SG | 2025-09-12 | 9 | 9.02499 | ||||||||||||
2025-09-03 | 12:48:57 | SG | 2025-09-12 | 9 | 9.025 | ||||||||||||
2025-09-03 | 12:48:57 | SG | 2025-09-12 | 9 | 9.025 | ||||||||||||
2025-09-02 | 10:03:40 | SG | 2025-09-05 | 3 | 8.89 | ||||||||||||
2025-08-29 | 15:32:10 | SG | 2026-04-17 | 231 | 8.995 | ||||||||||||
2025-08-29 | 15:31:45 | SG | 2026-01-16 | 140 | 8.995 | ||||||||||||
2025-08-29 | 13:52:29 | SG | 2026-01-16 | 140 | 9.095 | ||||||||||||
2025-08-29 | 12:09:14 | SG | 2025-09-05 | 7 | 9.085 | ||||||||||||
2025-08-29 | 10:36:01 | SG | 2026-01-16 | 140 | 9.075 | ||||||||||||
2025-08-29 | 10:36:01 | SG | 2026-01-16 | 140 | 9.075 | ||||||||||||
2025-08-28 | 15:40:39 | SG | 2025-10-17 | 50 | 9.225 | ||||||||||||
2025-08-28 | 10:02:17 | SG | 2025-09-12 | 15 | 9.435 | ||||||||||||
2025-08-28 | 09:40:47 | SG | 2025-08-29 | 1 | 9.32999 | ||||||||||||
2025-08-27 | 15:02:59 | SG | 2025-10-17 | 51 | 9.065 | ||||||||||||
2025-08-26 | 12:23:52 | SG | 2026-01-16 | 143 | 9.065 | ||||||||||||
2025-08-26 | 12:23:52 | SG | 2026-01-16 | 143 | 9.065 | ||||||||||||
2025-08-26 | 12:23:52 | SG | 2026-01-16 | 143 | 9.065 | ||||||||||||
2025-08-25 | 10:20:26 | SG | 2025-09-19 | 25 | 9.085 | ||||||||||||
2025-08-22 | 14:06:25 | SG | 2027-01-15 | 511 | 9.255 | ||||||||||||
2025-08-22 | 14:06:25 | SG | 2027-01-15 | 511 | 9.255 | ||||||||||||
2025-08-22 | 14:06:25 | SG | 2027-01-15 | 511 | 9.255 | ||||||||||||
2025-08-22 | 11:11:49 | SG | 2025-08-22 | 0 | 9.105 | ||||||||||||
2025-08-21 | 11:43:21 | SG | 2025-08-29 | 8 | 8.835 | ||||||||||||
2025-08-21 | 10:11:27 | SG | 2025-09-12 | 22 | 8.675 | ||||||||||||
2025-08-21 | 09:56:26 | SG | 2025-08-22 | 1 | 8.595 | ||||||||||||
2025-08-21 | 09:43:19 | SG | 2025-09-05 | 15 | 8.48 | ||||||||||||
2025-08-21 | 09:41:43 | SG | 2025-09-19 | 29 | 8.56003 | ||||||||||||
2025-08-21 | 09:40:42 | SG | 2025-09-12 | 22 | 8.605 | ||||||||||||
2025-08-21 | 09:38:59 | SG | 2026-01-16 | 148 | 8.65 | ||||||||||||
2025-08-20 | 14:44:17 | SG | 2026-01-16 | 149 | 9.055 | ||||||||||||
2025-08-20 | 10:51:41 | SG | 2025-10-17 | 58 | 9.025 | ||||||||||||
2025-08-20 | 10:51:41 | SG | 2025-10-17 | 58 | 9.025 | ||||||||||||
2025-08-20 | 10:51:41 | SG | 2025-10-17 | 58 | 9.025 | ||||||||||||
2025-08-19 | 11:05:18 | SG | 2025-08-29 | 10 | 9.275 | ||||||||||||
2025-08-19 | 11:01:19 | SG | 2025-09-19 | 31 | 9.23 | ||||||||||||
2025-08-19 | 10:55:05 | SG | 2025-08-29 | 10 | 9.305 | ||||||||||||
2025-08-19 | 10:53:03 | SG | 2025-08-29 | 10 | 9.3 | ||||||||||||
2025-08-19 | 10:53:03 | SG | 2025-08-29 | 10 | 9.275 | ||||||||||||
2025-08-19 | 10:33:43 | SG | 2025-08-22 | 3 | 9.435 | ||||||||||||
2025-08-15 | 13:53:50 | SG | 2025-09-19 | 35 | 9.215 | ||||||||||||
2025-08-15 | 10:37:25 | SG | 2026-01-16 | 154 | 9.29 | ||||||||||||
2025-08-15 | 10:37:25 | SG | 2026-01-16 | 154 | 9.285 | ||||||||||||
2025-08-15 | 10:21:32 | SG | 2025-10-17 | 63 | 9.21501 | ||||||||||||
2025-08-15 | 10:21:32 | SG | 2025-10-17 | 63 | 9.21501 | ||||||||||||
2025-08-14 | 13:46:46 | SG | 2026-01-16 | 155 | 9.145 | ||||||||||||
2025-08-14 | 13:45:36 | SG | 2025-10-17 | 64 | 9.135 | ||||||||||||
2025-08-14 | 13:45:36 | SG | 2025-10-17 | 64 | 9.135 | ||||||||||||
2025-08-14 | 13:45:36 | SG | 2025-10-17 | 64 | 9.135 | ||||||||||||
2025-08-14 | 13:45:36 | SG | 2025-10-17 | 64 | 9.135 | ||||||||||||
2025-08-14 | 13:38:00 | SG | 2025-10-17 | 64 | 9.135 | ||||||||||||
2025-08-14 | 09:58:10 | SG | 2027-01-15 | 519 | 9.125 | ||||||||||||
2025-08-14 | 09:58:10 | SG | 2027-01-15 | 519 | 9.125 | ||||||||||||
2025-08-14 | 09:58:10 | SG | 2027-01-15 | 519 | 9.125 | ||||||||||||
2025-08-14 | 09:54:43 | SG | 2027-01-15 | 519 | 9.17 | ||||||||||||
2025-08-14 | 09:54:43 | SG | 2027-01-15 | 519 | 9.17 | ||||||||||||
2025-08-12 | 09:54:42 | SG | 2025-09-05 | 24 | 9.365 | ||||||||||||
2025-08-11 | 10:15:18 | SG | 2027-01-15 | 522 | 9.955 | SSR | |||||||||||
2025-08-11 | 10:15:19 | SG | 2027-01-15 | 522 | 9.945 | SSR | |||||||||||
2025-08-08 | 15:42:57 | SG | 2025-10-17 | 70 | 9.655 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 15:42:42 | SG | 2027-01-15 | 525 | 9.655 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 15:42:42 | SG | 2027-01-15 | 525 | 9.655 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 15:35:10 | SG | 2025-08-08 | 0 | 9.51 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 14:38:44 | SG | 2026-01-16 | 161 | 9.575 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 13:34:13 | SG | 2026-01-16 | 161 | 9.445 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 13:34:13 | SG | 2026-01-16 | 161 | 9.455 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 11:34:42 | SG | 2025-10-17 | 70 | 9.31139 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 11:25:29 | SG | 2025-08-08 | 0 | 9.145 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 11:25:29 | SG | 2025-08-08 | 0 | 9.145 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 10:58:47 | SG | 2025-08-08 | 0 | 9.135 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 10:47:59 | SG | 2025-09-05 | 28 | 9.225 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 10:34:05 | SG | 2025-08-08 | 0 | 9.02404 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 10:34:05 | SG | 2025-08-08 | 0 | 9.025 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 10:14:33 | SG | 2025-10-17 | 70 | 9.405 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 10:13:14 | SG | 2025-08-08 | 0 | 9.505 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 10:12:15 | SG | 2025-08-15 | 7 | 9.575 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 10:12:02 | SG | 2025-08-15 | 7 | 9.6 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 10:12:02 | SG | 2025-08-15 | 7 | 9.595 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 10:12:02 | SG | 2025-08-15 | 7 | 9.6 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 10:04:27 | SG | 2025-08-08 | 0 | 9.535 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 10:04:03 | SG | 2025-08-08 | 0 | 9.62 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 10:02:13 | SG | 2025-08-08 | 0 | 9.56287 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 10:02:11 | SG | 2025-08-15 | 7 | 9.465 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 09:59:20 | SG | 2025-08-15 | 7 | 9.41 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 09:59:11 | SG | 2025-08-15 | 7 | 9.51475 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 09:58:11 | SG | 2025-08-08 | 0 | 9.6 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 09:56:46 | SG | 2025-08-15 | 7 | 9.49473 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 09:55:15 | SG | 2025-08-15 | 7 | 9.41894 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 09:55:15 | SG | 2025-08-15 | 7 | 9.42 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 09:55:15 | SG | 2025-08-15 | 7 | 9.42 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 09:54:04 | SG | 2025-08-08 | 0 | 9.42 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 09:53:10 | SG | 2025-08-08 | 0 | 9.275 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 09:47:36 | SG | 2025-08-15 | 7 | 9.03572 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 09:47:36 | SG | 2025-08-15 | 7 | 9.0351 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 09:47:32 | SG | 2026-01-16 | 161 | 9.125 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 09:46:53 | SG | 2025-08-08 | 0 | 9.14 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 09:44:33 | SG | 2026-01-16 | 161 | 9.14999 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 09:35:57 | SG | 2025-08-08 | 0 | 8.975 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 09:34:20 | SG | 2025-08-08 | 0 | 8.91528 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 09:32:17 | SG | 2025-08-08 | 0 | 8.92 | Post-Earnings / SSR | |||||||||||
2025-08-08 | 09:32:07 | SG | 2025-08-08 | 0 | 9.055 | Post-Earnings / SSR | |||||||||||
2025-08-07 | 15:54:07 | SG | 2025-08-08 | 1 | 12.655 | Pre-Earnings | |||||||||||
2025-08-07 | 15:50:06 | SG | 2025-08-08 | 1 | 12.645 | Pre-Earnings | |||||||||||
2025-08-07 | 15:49:37 | SG | 2025-08-08 | 1 | 12.63 | Pre-Earnings | |||||||||||
2025-08-07 | 15:47:32 | SG | 2025-08-08 | 1 | 12.645 | Pre-Earnings | |||||||||||
2025-08-07 | 15:33:53 | SG | 2026-01-16 | 162 | 12.665 | Pre-Earnings | |||||||||||
2025-08-07 | 15:05:23 | SG | 2025-09-19 | 43 | 12.6453 | Pre-Earnings | |||||||||||
2025-08-07 | 15:05:23 | SG | 2025-09-19 | 43 | 12.645 | Pre-Earnings | |||||||||||
2025-08-07 | 14:55:18 | SG | 2025-08-15 | 8 | 12.7147 | Pre-Earnings | |||||||||||
2025-08-07 | 14:37:19 | SG | 2025-08-08 | 1 | 12.64 | Pre-Earnings | |||||||||||
2025-08-07 | 14:37:19 | SG | 2025-08-08 | 1 | 12.6253 | Pre-Earnings | |||||||||||
2025-08-07 | 14:33:26 | SG | 2025-08-15 | 8 | 12.565 | Pre-Earnings | |||||||||||
2025-08-07 | 13:49:53 | SG | 2025-08-08 | 1 | 12.41 | Pre-Earnings | |||||||||||
2025-08-07 | 13:33:52 | SG | 2025-08-08 | 1 | 12.37 | Pre-Earnings | |||||||||||
2025-08-07 | 12:46:31 | SG | 2025-08-15 | 8 | 12.42 | Pre-Earnings | |||||||||||
2025-08-07 | 12:02:39 | SG | 2025-08-08 | 1 | 12.345 | Pre-Earnings | |||||||||||
2025-08-07 | 10:58:23 | SG | 2025-08-15 | 8 | 12.3601 | Pre-Earnings | |||||||||||
2025-08-07 | 10:58:23 | SG | 2025-08-15 | 8 | 12.3404 | Pre-Earnings | |||||||||||
2025-08-07 | 10:58:23 | SG | 2025-08-15 | 8 | 12.345 | Pre-Earnings | |||||||||||
2025-08-07 | 10:58:23 | SG | 2025-08-15 | 8 | 12.345 | Pre-Earnings | |||||||||||
2025-08-07 | 10:58:23 | SG | 2025-08-15 | 8 | 12.345 | Pre-Earnings | |||||||||||
2025-08-07 | 10:58:23 | SG | 2025-08-15 | 8 | 12.345 | Pre-Earnings | |||||||||||
2025-08-07 | 10:58:02 | SG | 2025-08-15 | 8 | 12.385 | Pre-Earnings | |||||||||||
2025-08-07 | 10:58:02 | SG | 2025-08-15 | 8 | 12.385 | Pre-Earnings | |||||||||||
2025-08-07 | 10:52:36 | SG | 2025-08-15 | 8 | 12.31 | Pre-Earnings | |||||||||||
2025-08-07 | 10:27:47 | SG | 2025-08-15 | 8 | 12.32 | Pre-Earnings | |||||||||||
2025-08-07 | 10:07:14 | SG | 2025-08-15 | 8 | 12.54 | Pre-Earnings | |||||||||||
2025-08-07 | 10:07:14 | SG | 2025-08-15 | 8 | 12.545 | Pre-Earnings | |||||||||||
2025-08-07 | 10:00:05 | SG | 2025-08-15 | 8 | 12.72 | Pre-Earnings | |||||||||||
2025-08-07 | 09:48:55 | SG | 2025-08-08 | 1 | 12.6 | Pre-Earnings | |||||||||||
2025-08-07 | 09:35:50 | SG | 2025-08-08 | 1 | 12.595 | Pre-Earnings | |||||||||||
2025-08-06 | 15:22:22 | SG | 2025-08-08 | 2 | 12.295 | ||||||||||||
2025-08-06 | 15:04:04 | SG | 2025-08-15 | 9 | 12.22 | ||||||||||||
2025-08-05 | 15:29:15 | SG | 2025-08-15 | 10 | 12.525 | ||||||||||||
2025-08-05 | 15:29:15 | SG | 2025-08-15 | 10 | 12.525 | ||||||||||||
2025-08-05 | 13:17:32 | SG | 2025-08-15 | 10 | 12.54 | ||||||||||||
2025-08-05 | 13:17:32 | SG | 2025-08-15 | 10 | 12.5104 | ||||||||||||
2025-08-04 | 13:53:35 | SG | 2026-01-16 | 165 | 12.345 | ||||||||||||
2025-08-04 | 13:44:21 | SG | 2025-08-08 | 4 | 12.415 | ||||||||||||
2025-08-04 | 13:44:21 | SG | 2025-08-08 | 4 | 12.415 | ||||||||||||
2025-08-04 | 09:46:10 | SG | 2025-08-08 | 4 | 12.075 | ||||||||||||
2025-08-04 | 09:46:10 | SG | 2025-08-08 | 4 | 12.075 | ||||||||||||
2025-08-04 | 09:34:30 | SG | 2025-08-08 | 4 | 12.0 | ||||||||||||
2025-08-01 | 14:51:26 | SG | 2025-08-01 | 0 | 12.045 | ||||||||||||
2025-08-01 | 14:47:47 | SG | 2025-08-01 | 0 | 12.105 | ||||||||||||
2025-08-01 | 14:47:47 | SG | 2025-08-01 | 0 | 12.105 | ||||||||||||
2025-08-01 | 14:36:57 | SG | 2025-08-15 | 14 | 12.075 | ||||||||||||
2025-08-01 | 14:11:15 | SG | 2025-08-08 | 7 | 11.975 | ||||||||||||
2025-08-01 | 14:08:19 | SG | 2026-01-16 | 168 | 11.92 | ||||||||||||
2025-08-01 | 14:08:19 | SG | 2026-01-16 | 168 | 11.94 | ||||||||||||
2025-08-01 | 14:08:19 | SG | 2026-01-16 | 168 | 11.94 | ||||||||||||
2025-08-01 | 14:08:19 | SG | 2026-01-16 | 168 | 11.94 | ||||||||||||
2025-08-01 | 12:59:11 | SG | 2025-08-15 | 14 | 12.075 | ||||||||||||
2025-08-01 | 10:13:57 | SG | 2026-01-16 | 168 | 12.0353 | ||||||||||||
2025-07-31 | 13:31:06 | SG | 2027-01-15 | 533 | 13.085 | ||||||||||||
2025-07-31 | 12:24:54 | SG | 2027-01-15 | 533 | 13.04 | ||||||||||||
2025-07-31 | 12:13:35 | SG | 2025-08-08 | 8 | 13.025 | ||||||||||||
2025-07-30 | 09:30:06 | SG | 2025-10-17 | 79 | 13.345 | ||||||||||||
2025-07-29 | 15:59:25 | SG | 2025-10-17 | 80 | 13.135 | ||||||||||||
2025-07-29 | 15:59:25 | SG | 2025-10-17 | 80 | 13.145 | ||||||||||||
2025-07-29 | 15:59:25 | SG | 2025-10-17 | 80 | 13.14 | ||||||||||||
2025-07-29 | 15:53:21 | SG | 2026-01-16 | 171 | 13.11 | ||||||||||||
2025-07-29 | 15:40:03 | SG | 2025-10-17 | 80 | 13.145 | ||||||||||||
2025-07-29 | 15:22:51 | SG | 2025-08-08 | 10 | 13.275 | ||||||||||||
2025-07-29 | 14:46:10 | SG | 2025-08-15 | 17 | 13.27 | ||||||||||||
2025-07-29 | 13:59:46 | SG | 2025-08-15 | 17 | 13.32 | ||||||||||||
2025-07-29 | 11:29:09 | SG | 2025-10-17 | 80 | 13.25 | ||||||||||||
2025-07-28 | 14:01:36 | SG | 2025-08-15 | 18 | 14.315 | ||||||||||||
2025-07-25 | 15:26:21 | SG | 2025-08-01 | 7 | 14.625 | SSR | |||||||||||
2025-07-25 | 10:38:58 | SG | 2025-08-01 | 7 | 14.765 | SSR | |||||||||||
2025-07-25 | 10:38:01 | SG | 2025-08-01 | 7 | 14.805 | SSR | |||||||||||
2025-07-25 | 09:43:15 | SG | 2025-08-15 | 21 | 14.47 | SSR | |||||||||||
2025-07-25 | 09:43:15 | SG | 2025-08-15 | 21 | 14.47 | SSR | |||||||||||
2025-07-24 | 15:51:53 | SG | 2025-07-25 | 1 | 14.245 | SSR | |||||||||||
2025-07-24 | 15:51:52 | SG | 2025-07-25 | 1 | 14.245 | SSR | |||||||||||
2025-07-24 | 15:51:53 | SG | 2025-07-25 | 1 | 14.245 | SSR | |||||||||||
2025-07-24 | 15:43:00 | SG | 2027-01-15 | 540 | 14.285 | SSR | |||||||||||
2025-07-24 | 15:43:00 | SG | 2027-01-15 | 540 | 14.285 | SSR | |||||||||||
2025-07-24 | 14:47:13 | SG | 2025-08-08 | 15 | 14.265 | SSR | |||||||||||
2025-07-24 | 13:35:19 | SG | 2025-08-08 | 15 | 14.355 | SSR | |||||||||||
2025-07-24 | 12:36:27 | SG | 2025-08-15 | 22 | 14.2301 | SSR | |||||||||||
2025-07-24 | 12:36:27 | SG | 2025-08-15 | 22 | 14.2301 | SSR | |||||||||||
2025-07-24 | 12:34:32 | SG | 2025-09-19 | 57 | 14.305 | SSR | |||||||||||
2025-07-24 | 12:31:41 | SG | 2025-09-19 | 57 | 14.315 | SSR | |||||||||||
2025-07-24 | 11:22:31 | SG | 2025-09-19 | 57 | 14.575 | SSR | |||||||||||
2025-07-24 | 11:22:31 | SG | 2025-09-19 | 57 | 14.575 | SSR | |||||||||||
2025-07-24 | 10:11:11 | SG | 2025-08-01 | 8 | 14.715 | ||||||||||||
2025-07-24 | 09:56:58 | SG | 2025-08-01 | 8 | 14.885 | ||||||||||||
2025-07-23 | 15:51:48 | SG | 2025-10-17 | 86 | 16.175 | ||||||||||||
2025-07-23 | 13:03:43 | SG | 2025-07-25 | 2 | 16.5 | ||||||||||||
2025-07-23 | 13:03:43 | SG | 2025-07-25 | 2 | 16.525 | ||||||||||||
2025-07-23 | 12:17:11 | SG | 2025-07-25 | 2 | 16.37 | ||||||||||||
2025-07-23 | 12:17:11 | SG | 2025-07-25 | 2 | 16.3746 | ||||||||||||
2025-07-23 | 10:34:35 | SG | 2026-01-16 | 177 | 16.525 | ||||||||||||
2025-07-23 | 10:01:01 | SG | 2025-10-17 | 86 | 16.32 | ||||||||||||
2025-07-23 | 09:53:10 | SG | 2025-10-17 | 86 | 16.26 | ||||||||||||
2025-07-23 | 09:52:22 | SG | 2026-01-16 | 177 | 16.255 | ||||||||||||
2025-07-23 | 09:33:18 | SG | 2025-07-25 | 2 | 16.215 | ||||||||||||
2025-07-23 | 09:30:40 | SG | 2025-08-15 | 23 | 16.125 | ||||||||||||
2025-07-23 | 09:30:40 | SG | 2025-08-15 | 23 | 16.125 | ||||||||||||
2025-07-22 | 15:40:59 | SG | 2025-08-15 | 24 | 15.365 | ||||||||||||
2025-07-22 | 15:40:14 | SG | 2025-08-01 | 10 | 15.315 | ||||||||||||
2025-07-22 | 15:14:50 | SG | 2026-01-16 | 178 | 15.04 | ||||||||||||
2025-07-22 | 15:14:50 | SG | 2026-01-16 | 178 | 15.04 | ||||||||||||
2025-07-22 | 15:14:12 | SG | 2025-09-19 | 59 | 15.0199 | ||||||||||||
2025-07-22 | 14:54:57 | SG | 2025-09-19 | 59 | 14.995 | ||||||||||||
2025-07-22 | 12:53:44 | SG | 2026-01-16 | 178 | 14.54 | ||||||||||||
2025-07-22 | 11:23:03 | SG | 2025-07-25 | 3 | 14.465 | ||||||||||||
2025-07-22 | 11:23:03 | SG | 2025-07-25 | 3 | 14.505 | ||||||||||||
2025-07-22 | 11:23:03 | SG | 2025-07-25 | 3 | 14.485 | ||||||||||||
2025-07-22 | 09:57:17 | SG | 2025-10-17 | 87 | 14.465 | ||||||||||||
2025-07-21 | 10:00:24 | SG | 2025-08-01 | 11 | 14.415 | ||||||||||||
2025-07-21 | 09:52:48 | SG | 2025-08-15 | 25 | 14.255 | ||||||||||||
2025-07-18 | 11:00:29 | SG | 2025-08-29 | 42 | 14.05 | ||||||||||||
2025-07-18 | 10:26:17 | SG | 2027-01-15 | 546 | 13.9864 | ||||||||||||
2025-07-18 | 10:26:17 | SG | 2027-01-15 | 546 | 13.9864 | ||||||||||||
2025-07-18 | 10:21:42 | SG | 2027-01-15 | 546 | 13.92 | ||||||||||||
2025-07-18 | 10:21:42 | SG | 2027-01-15 | 546 | 13.9906 | ||||||||||||
2025-07-18 | 10:21:42 | SG | 2027-01-15 | 546 | 14.0 | ||||||||||||
2025-07-18 | 10:21:42 | SG | 2027-01-15 | 546 | 13.98 | ||||||||||||
2025-07-18 | 10:21:42 | SG | 2027-01-15 | 546 | 13.98 | ||||||||||||
2025-07-18 | 10:21:42 | SG | 2027-01-15 | 546 | 13.92 | ||||||||||||
2025-07-18 | 10:02:07 | SG | 2027-01-15 | 546 | 13.985 | ||||||||||||
2025-07-18 | 10:01:52 | SG | 2027-01-15 | 546 | 13.985 | ||||||||||||
2025-07-18 | 10:01:52 | SG | 2027-01-15 | 546 | 13.985 | ||||||||||||
2025-07-18 | 10:01:52 | SG | 2027-01-15 | 546 | 13.985 | ||||||||||||
2025-07-18 | 10:01:52 | SG | 2027-01-15 | 546 | 13.985 | ||||||||||||
2025-07-18 | 10:01:40 | SG | 2027-01-15 | 546 | 13.98 | ||||||||||||
2025-07-18 | 10:01:20 | SG | 2027-01-15 | 546 | 13.985 | ||||||||||||
2025-07-18 | 10:01:21 | SG | 2027-01-15 | 546 | 13.985 | ||||||||||||
2025-07-18 | 10:01:20 | SG | 2027-01-15 | 546 | 13.985 | ||||||||||||
2025-07-17 | 15:57:52 | SG | 2026-01-16 | 183 | 13.635 | ||||||||||||
2025-07-17 | 15:57:52 | SG | 2026-01-16 | 183 | 13.635 | ||||||||||||
2025-07-17 | 15:27:17 | SG | 2026-01-16 | 183 | 13.8 | ||||||||||||
2025-07-17 | 15:27:17 | SG | 2026-01-16 | 183 | 13.8 | ||||||||||||
2025-07-17 | 15:27:17 | SG | 2026-01-16 | 183 | 13.8 | ||||||||||||
2025-07-17 | 15:26:44 | SG | 2026-01-16 | 183 | 13.765 | ||||||||||||
2025-07-17 | 15:26:30 | SG | 2026-01-16 | 183 | 13.785 | ||||||||||||
2025-07-17 | 15:26:31 | SG | 2026-01-16 | 183 | 13.775 | ||||||||||||
2025-07-17 | 15:26:28 | SG | 2026-01-16 | 183 | 13.8442 | ||||||||||||
2025-07-17 | 15:26:15 | SG | 2026-01-16 | 183 | 13.835 | ||||||||||||
2025-07-17 | 15:26:15 | SG | 2026-01-16 | 183 | 13.835 | ||||||||||||
2025-07-17 | 12:03:20 | SG | 2025-10-17 | 92 | 14.0403 | ||||||||||||
2025-07-16 | 15:38:00 | SG | 2026-01-16 | 184 | 13.11 | ||||||||||||
2025-07-16 | 15:36:44 | SG | 2026-01-16 | 184 | 13.089 | ||||||||||||
2025-07-16 | 15:36:03 | SG | 2026-01-16 | 184 | 13.055 | ||||||||||||
2025-07-16 | 15:36:03 | SG | 2026-01-16 | 184 | 13.0701 | ||||||||||||
2025-07-16 | 15:35:59 | SG | 2026-01-16 | 184 | 13.065 | ||||||||||||
2025-07-16 | 15:35:59 | SG | 2026-01-16 | 184 | 13.065 | ||||||||||||
2025-07-16 | 10:42:32 | SG | 2026-01-16 | 184 | 12.805 | ||||||||||||
2025-07-16 | 10:42:32 | SG | 2026-01-16 | 184 | 12.805 | ||||||||||||
2025-07-16 | 10:42:32 | SG | 2026-01-16 | 184 | 12.805 | ||||||||||||
2025-07-16 | 10:36:05 | SG | 2026-01-16 | 184 | 12.9 | ||||||||||||
2025-07-16 | 10:21:45 | SG | 2026-01-16 | 184 | 12.98 | ||||||||||||
2025-07-16 | 10:21:24 | SG | 2026-01-16 | 184 | 12.98 | ||||||||||||
2025-07-15 | 15:50:31 | SG | 2025-07-18 | 3 | 13.05 | ||||||||||||
2025-07-14 | 11:35:55 | SG | 2026-01-16 | 186 | 13.35 | ||||||||||||
2025-07-14 | 09:54:32 | SG | 2025-07-18 | 4 | 13.895 | ||||||||||||
2025-07-11 | 15:48:46 | SG | 2025-08-01 | 21 | 13.555 | ||||||||||||
2025-07-11 | 11:00:20 | SG | 2025-08-01 | 21 | 13.52 | ||||||||||||
2025-07-10 | 12:08:00 | SG | 2025-08-15 | 36 | 13.64 | ||||||||||||
2025-07-07 | 15:30:44 | SG | 2025-07-18 | 11 | 13.235 | SSR | |||||||||||
2025-07-07 | 15:30:44 | SG | 2025-07-18 | 11 | 13.2543 | SSR | |||||||||||
2025-07-07 | 15:28:30 | SG | 2025-07-18 | 11 | 13.215 | SSR | |||||||||||
2025-07-07 | 15:27:24 | SG | 2025-07-18 | 11 | 13.215 | SSR | |||||||||||
2025-07-07 | 15:27:24 | SG | 2025-07-18 | 11 | 13.215 | SSR | |||||||||||
2025-07-07 | 15:26:56 | SG | 2025-07-18 | 11 | 13.195 | SSR | |||||||||||
2025-07-07 | 12:04:13 | SG | 2025-07-18 | 11 | 13.25 | ||||||||||||
2025-07-07 | 11:05:35 | SG | 2025-07-25 | 18 | 13.28 | ||||||||||||
2025-07-07 | 11:05:35 | SG | 2025-07-25 | 18 | 13.28 | ||||||||||||
2025-07-07 | 10:31:24 | SG | 2025-08-15 | 39 | 13.575 | ||||||||||||
2025-07-03 | 11:27:35 | SG | 2027-01-15 | 561 | 14.505 | ||||||||||||
2025-07-02 | 15:49:05 | SG | 2025-07-03 | 1 | 14.415 | ||||||||||||
2025-07-02 | 15:49:06 | SG | 2025-07-03 | 1 | 14.425 | ||||||||||||
2025-07-02 | 15:49:06 | SG | 2025-07-03 | 1 | 14.425 | ||||||||||||
2025-07-02 | 12:01:08 | SG | 2025-07-18 | 16 | 14.72 | ||||||||||||
2025-07-02 | 09:31:21 | SG | 2025-07-03 | 1 | 14.96 | ||||||||||||
2025-07-01 | 15:42:08 | SG | 2026-01-16 | 199 | 14.695 | ||||||||||||
2025-07-01 | 13:26:04 | SG | 2025-07-11 | 10 | 14.7548 | ||||||||||||
2025-07-01 | 12:44:16 | SG | 2026-01-16 | 199 | 14.695 | ||||||||||||
2025-07-01 | 12:44:16 | SG | 2026-01-16 | 199 | 14.695 | ||||||||||||
2025-07-01 | 12:34:02 | SG | 2026-01-16 | 199 | 14.7048 | ||||||||||||
2025-07-01 | 11:59:58 | SG | 2025-08-15 | 45 | 14.56 | ||||||||||||
2025-07-01 | 11:58:11 | SG | 2026-01-16 | 199 | 14.605 | ||||||||||||
2025-07-01 | 11:57:55 | SG | 2025-07-03 | 2 | 14.475 | ||||||||||||
2025-07-01 | 11:57:55 | SG | 2025-07-03 | 2 | 14.495 | ||||||||||||
2025-07-01 | 11:57:14 | SG | 2026-01-16 | 199 | 14.45 | ||||||||||||
2025-07-01 | 10:16:11 | SG | 2026-01-16 | 199 | 14.1337 | ||||||||||||
2025-07-01 | 10:16:11 | SG | 2026-01-16 | 199 | 14.1349 | ||||||||||||
2025-07-01 | 10:16:11 | SG | 2026-01-16 | 199 | 14.1337 | ||||||||||||
2025-06-30 | 15:55:18 | SG | 2025-10-17 | 109 | 14.975 | ||||||||||||
2025-06-30 | 14:57:02 | SG | 2025-07-18 | 18 | 14.625 | ||||||||||||
2025-06-30 | 13:16:20 | SG | 2026-01-16 | 200 | 15.05 | ||||||||||||
2025-06-30 | 12:15:09 | SG | 2025-07-18 | 18 | 14.77 | ||||||||||||
2025-06-30 | 12:13:40 | SG | 2025-07-18 | 18 | 14.77 | ||||||||||||
2025-06-30 | 11:51:30 | SG | 2025-07-18 | 18 | 14.86 | ||||||||||||
2025-06-30 | 11:51:30 | SG | 2025-07-18 | 18 | 14.86 | ||||||||||||
2025-06-30 | 11:48:33 | SG | 2025-07-11 | 11 | 14.81 | ||||||||||||
2025-06-30 | 11:42:32 | SG | 2025-07-18 | 18 | 14.765 | ||||||||||||
2025-06-30 | 11:42:32 | SG | 2025-07-18 | 18 | 14.765 | ||||||||||||
2025-06-30 | 11:41:34 | SG | 2025-07-18 | 18 | 14.67 | ||||||||||||
2025-06-30 | 11:39:34 | SG | 2025-07-18 | 18 | 14.7549 | ||||||||||||
2025-06-30 | 11:39:34 | SG | 2025-07-18 | 18 | 14.7549 | ||||||||||||
2025-06-30 | 11:13:35 | SG | 2025-07-18 | 18 | 14.405 | ||||||||||||
2025-06-30 | 11:13:35 | SG | 2025-07-18 | 18 | 14.4591 | ||||||||||||
2025-06-30 | 11:13:35 | SG | 2025-07-18 | 18 | 14.4495 | ||||||||||||
2025-06-30 | 10:55:54 | SG | 2026-01-16 | 200 | 14.49 | ||||||||||||
2025-06-30 | 10:22:20 | SG | 2025-08-15 | 46 | 14.58 | ||||||||||||
2025-06-30 | 10:07:10 | SG | 2025-07-03 | 3 | 14.8712 | ||||||||||||
2025-06-30 | 10:02:46 | SG | 2026-01-16 | 200 | 14.88 | ||||||||||||
2025-06-30 | 10:02:46 | SG | 2026-01-16 | 200 | 14.88 | ||||||||||||
2025-06-30 | 09:49:21 | SG | 2026-01-16 | 200 | 14.68 | ||||||||||||
2025-06-26 | 13:19:32 | SG | 2025-07-18 | 22 | 13.365 | ||||||||||||
2025-06-26 | 12:13:17 | SG | 2025-07-18 | 22 | 13.44 | ||||||||||||
2025-06-25 | 15:56:29 | SG | 2025-07-18 | 23 | 12.615 | ||||||||||||
2025-06-25 | 15:56:29 | SG | 2025-07-18 | 23 | 12.615 | ||||||||||||
2025-06-25 | 14:21:03 | SG | 2025-07-18 | 23 | 12.585 | ||||||||||||
2025-06-25 | 14:20:17 | SG | 2025-07-18 | 23 | 12.605 | ||||||||||||
2025-06-25 | 13:34:54 | SG | 2025-07-18 | 23 | 12.605 | ||||||||||||
2025-06-24 | 12:54:52 | SG | 2027-01-15 | 570 | 13.48 | ||||||||||||
2025-06-24 | 11:38:08 | SG | 2026-01-16 | 206 | 13.8121 | ||||||||||||
2025-06-24 | 11:38:06 | SG | 2026-01-16 | 206 | 13.7728 | ||||||||||||
2025-06-24 | 10:49:58 | SG | 2026-01-16 | 206 | 13.7344 | ||||||||||||
2025-06-24 | 10:49:55 | SG | 2026-01-16 | 206 | 13.745 | ||||||||||||
2025-06-24 | 10:49:52 | SG | 2026-01-16 | 206 | 13.735 | ||||||||||||
2025-06-24 | 10:49:52 | SG | 2026-01-16 | 206 | 13.735 | ||||||||||||
2025-06-24 | 10:49:45 | SG | 2026-01-16 | 206 | 13.7648 | ||||||||||||
2025-06-24 | 10:21:38 | SG | 2026-01-16 | 206 | 13.89 | ||||||||||||
2025-06-24 | 10:15:59 | SG | 2025-07-18 | 24 | 13.8506 | ||||||||||||
2025-06-24 | 09:46:25 | SG | 2025-07-18 | 24 | 14.14 | ||||||||||||
2025-06-24 | 09:45:31 | SG | 2025-07-18 | 24 | 14.0758 | ||||||||||||
2025-06-23 | 15:49:00 | SG | 2025-07-18 | 25 | 12.835 | ||||||||||||
2025-06-23 | 15:49:00 | SG | 2025-07-18 | 25 | 12.835 | ||||||||||||
2025-06-23 | 12:45:30 | SG | 2025-07-18 | 25 | 12.6949 | ||||||||||||
2025-06-23 | 10:22:38 | SG | 2025-07-18 | 25 | 13.065 | ||||||||||||
2025-06-20 | 09:35:22 | SG | 2025-08-15 | 56 | 12.29 | ||||||||||||
2025-06-20 | 09:34:36 | SG | 2025-08-15 | 56 | 12.31 | ||||||||||||
2025-06-20 | 09:33:04 | SG | 2025-08-15 | 56 | 12.3 | ||||||||||||
2025-06-18 | 11:23:51 | SG | 2026-01-16 | 212 | 12.56 | ||||||||||||
2025-06-18 | 11:23:51 | SG | 2026-01-16 | 212 | 12.56 | ||||||||||||
2025-06-18 | 11:20:38 | SG | 2026-01-16 | 212 | 12.585 | ||||||||||||
2025-06-18 | 11:20:28 | SG | 2026-01-16 | 212 | 12.585 | ||||||||||||
2025-06-18 | 11:11:23 | SG | 2026-01-16 | 212 | 12.605 | ||||||||||||
2025-06-17 | 13:38:30 | SG | 2025-06-20 | 3 | 12.325 | ||||||||||||
2025-06-17 | 13:37:28 | SG | 2025-10-17 | 122 | 12.34 | ||||||||||||
2025-06-16 | 09:38:07 | SG | 2026-01-16 | 214 | 13.185 | ||||||||||||
2025-06-13 | 14:16:49 | SG | 2025-07-18 | 35 | 12.705 | ||||||||||||
2025-06-13 | 10:41:55 | SG | 2025-10-17 | 126 | 12.625 | ||||||||||||
2025-06-13 | 10:41:55 | SG | 2025-10-17 | 126 | 12.625 | ||||||||||||
2025-06-12 | 13:37:53 | SG | 2025-06-20 | 8 | 13.54 | ||||||||||||
2025-06-12 | 12:00:48 | SG | 2025-07-18 | 36 | 13.32 | ||||||||||||
2025-06-10 | 12:01:51 | SG | 2025-07-18 | 38 | 13.82 | ||||||||||||
2025-06-10 | 11:24:27 | SG | 2025-06-20 | 10 | 13.8106 | ||||||||||||
2025-06-10 | 09:37:21 | SG | 2025-06-20 | 10 | 13.765 | ||||||||||||
2025-06-10 | 09:32:35 | SG | 2025-06-20 | 10 | 14.1002 | ||||||||||||
2025-06-09 | 15:59:18 | SG | 2025-06-20 | 11 | 14.005 | ||||||||||||
2025-06-09 | 13:53:11 | SG | 2025-07-18 | 39 | 14.1348 | ||||||||||||
2025-06-09 | 13:11:21 | SG | 2025-10-17 | 130 | 14.02 | ||||||||||||
2025-06-09 | 13:11:21 | SG | 2025-10-17 | 130 | 14.02 | ||||||||||||
2025-06-06 | 11:28:24 | SG | 2025-07-18 | 42 | 13.895 | ||||||||||||
2025-06-06 | 11:27:14 | SG | 2025-07-18 | 42 | 13.8851 | ||||||||||||
2025-06-06 | 11:20:56 | SG | 2025-06-20 | 14 | 13.7896 | ||||||||||||
2025-06-06 | 11:16:57 | SG | 2025-06-20 | 14 | 13.8899 | ||||||||||||
2025-06-05 | 15:10:50 | SG | 2025-07-18 | 43 | 13.895 | ||||||||||||
2025-06-05 | 15:10:50 | SG | 2025-07-18 | 43 | 13.895 | ||||||||||||
2025-06-05 | 14:41:17 | SG | 2025-07-18 | 43 | 13.915 | ||||||||||||
2025-06-05 | 14:41:17 | SG | 2025-07-18 | 43 | 13.915 | ||||||||||||
2025-06-05 | 14:34:01 | SG | 2025-06-20 | 15 | 13.8101 | ||||||||||||
2025-06-05 | 14:01:05 | SG | 2025-06-20 | 15 | 13.99 | ||||||||||||
2025-06-05 | 12:47:33 | SG | 2025-06-20 | 15 | 14.005 | ||||||||||||
2025-06-05 | 12:47:33 | SG | 2025-06-20 | 15 | 14.005 | ||||||||||||
2025-06-05 | 12:46:02 | SG | 2025-06-20 | 15 | 14.06 | ||||||||||||
2025-06-05 | 12:46:03 | SG | 2025-06-20 | 15 | 14.045 | ||||||||||||
2025-06-05 | 12:40:48 | SG | 2025-06-20 | 15 | 14.085 | ||||||||||||
2025-06-05 | 12:16:52 | SG | 2025-06-20 | 15 | 14.185 | ||||||||||||
2025-06-05 | 11:45:57 | SG | 2025-06-20 | 15 | 14.375 | ||||||||||||
2025-06-05 | 11:39:25 | SG | 2026-01-16 | 225 | 14.345 | ||||||||||||
2025-06-04 | 14:18:04 | SG | 2025-06-20 | 16 | 14.635 | ||||||||||||
2025-06-04 | 13:58:48 | SG | 2025-06-20 | 16 | 14.685 | ||||||||||||
2025-06-04 | 13:29:05 | SG | 2025-07-18 | 44 | 14.515 | ||||||||||||
2025-06-04 | 13:29:05 | SG | 2025-07-18 | 44 | 14.525 | ||||||||||||
2025-06-04 | 13:14:09 | SG | 2025-06-20 | 16 | 14.46 | ||||||||||||
2025-06-04 | 13:10:56 | SG | 2025-06-20 | 16 | 14.42 | ||||||||||||
2025-06-04 | 12:30:54 | SG | 2025-06-20 | 16 | 14.345 | ||||||||||||
2025-06-04 | 12:30:51 | SG | 2025-06-20 | 16 | 14.365 | ||||||||||||
2025-06-04 | 12:30:51 | SG | 2025-06-20 | 16 | 14.365 | ||||||||||||
2025-06-04 | 11:00:19 | SG | 2025-06-20 | 16 | 14.17 | ||||||||||||
2025-06-04 | 11:00:20 | SG | 2025-06-20 | 16 | 14.17 | ||||||||||||
2025-06-04 | 10:38:14 | SG | 2025-07-18 | 44 | 14.465 | ||||||||||||
2025-06-03 | 15:15:00 | SG | 2025-07-18 | 45 | 14.4047 | ||||||||||||
2025-06-03 | 13:30:32 | SG | 2027-01-15 | 591 | 14.375 | ||||||||||||
2025-06-03 | 13:03:01 | SG | 2025-06-20 | 17 | 14.405 | ||||||||||||
2025-06-02 | 15:59:55 | SG | 2026-01-16 | 228 | 13.4495 | ||||||||||||
2025-06-02 | 09:56:08 | SG | 2025-06-20 | 18 | 13.095 | ||||||||||||
2025-06-02 | 09:56:08 | SG | 2025-06-20 | 18 | 13.095 | ||||||||||||
2025-06-02 | 09:36:30 | SG | 2026-01-16 | 228 | 13.395 | ||||||||||||
2025-05-30 | 15:44:38 | SG | 2027-01-15 | 595 | 13.575 | ||||||||||||
2025-05-30 | 15:44:38 | SG | 2027-01-15 | 595 | 13.575 | ||||||||||||
2025-05-30 | 15:44:22 | SG | 2027-01-15 | 595 | 13.575 | ||||||||||||
2025-05-30 | 12:20:08 | SG | 2025-07-18 | 49 | 13.5048 | ||||||||||||
2025-05-29 | 11:38:34 | SG | 2025-06-20 | 22 | 12.8952 | ||||||||||||
2025-05-29 | 11:31:34 | SG | 2025-06-20 | 22 | 13.02 | ||||||||||||
2025-05-29 | 09:30:25 | SG | 2025-07-18 | 50 | 14.007 | ||||||||||||
2025-05-28 | 15:25:59 | SG | 2026-01-16 | 233 | 13.7795 | ||||||||||||
2025-05-28 | 14:51:54 | SG | 2025-06-20 | 23 | 13.565 | ||||||||||||
2025-05-28 | 14:33:55 | SG | 2025-06-20 | 23 | 13.59 | ||||||||||||
2025-05-28 | 14:27:05 | SG | 2025-06-20 | 23 | 13.645 | ||||||||||||
2025-05-28 | 14:26:15 | SG | 2025-06-20 | 23 | 13.58 | ||||||||||||
2025-05-28 | 14:26:15 | SG | 2025-06-20 | 23 | 13.605 | ||||||||||||
2025-05-28 | 14:16:11 | SG | 2025-06-20 | 23 | 13.395 | ||||||||||||
2025-05-28 | 14:16:11 | SG | 2025-06-20 | 23 | 13.395 | ||||||||||||
2025-05-28 | 14:15:48 | SG | 2025-06-20 | 23 | 13.3499 | ||||||||||||
2025-05-28 | 12:49:42 | SG | 2025-06-20 | 23 | 13.11 | ||||||||||||
2025-05-28 | 12:49:42 | SG | 2025-06-20 | 23 | 13.11 | ||||||||||||
2025-05-23 | 11:00:46 | SG | 2027-01-15 | 602 | 13.225 | ||||||||||||
2025-05-23 | 10:25:39 | SG | 2026-01-16 | 238 | 13.13 | ||||||||||||
2025-05-23 | 10:25:39 | SG | 2026-01-16 | 238 | 13.13 | ||||||||||||
2025-05-20 | 12:19:50 | SG | 2025-10-17 | 150 | 14.7201 | ||||||||||||
2025-05-19 | 14:03:41 | SG | 2026-01-16 | 242 | 14.465 | ||||||||||||
2025-05-16 | 13:38:42 | SG | 2025-10-17 | 154 | 15.17 | ||||||||||||
2025-05-16 | 13:38:42 | SG | 2025-10-17 | 154 | 15.165 | ||||||||||||
2025-05-14 | 12:49:06 | SG | 2025-05-16 | 2 | 15.38 | ||||||||||||
2025-05-12 | 15:24:15 | SG | 2025-05-16 | 4 | 15.48 | SSR | |||||||||||
2025-05-12 | 15:24:13 | SG | 2025-05-16 | 4 | 15.48 | SSR | |||||||||||
2025-05-12 | 09:45:21 | SG | 2025-05-16 | 4 | 15.59 | SSR | |||||||||||
2025-05-12 | 09:41:48 | SG | 2025-05-16 | 4 | 16.1146 | SSR | |||||||||||
2025-05-12 | 09:30:37 | SG | 2025-05-16 | 4 | 16.16 | SSR | |||||||||||
2025-05-09 | 15:55:16 | SG | 2026-01-16 | 252 | 15.355 | Post-Earnings / SSR | |||||||||||
2025-05-09 | 15:22:11 | SG | 2025-06-20 | 42 | 14.765 | Post-Earnings / SSR | |||||||||||
2025-05-09 | 15:07:38 | SG | 2025-07-18 | 70 | 14.81 | Post-Earnings / SSR | |||||||||||
2025-05-09 | 14:37:06 | SG | 2025-05-16 | 7 | 14.655 | Post-Earnings / SSR | |||||||||||
2025-05-09 | 14:37:06 | SG | 2025-05-16 | 7 | 14.6595 | Post-Earnings / SSR | |||||||||||
2025-05-09 | 14:19:15 | SG | 2025-05-16 | 7 | 14.7199 | Post-Earnings / SSR | |||||||||||
2025-05-09 | 14:02:27 | SG | 2025-05-16 | 7 | 14.67 | Post-Earnings / SSR | |||||||||||
2025-05-09 | 13:41:33 | SG | 2026-01-16 | 252 | 14.765 | Post-Earnings / SSR | |||||||||||
2025-05-09 | 12:59:15 | SG | 2025-05-16 | 7 | 15.0 | Post-Earnings / SSR | |||||||||||
2025-05-09 | 12:34:14 | SG | 2025-06-20 | 42 | 14.9252 | Post-Earnings / SSR | |||||||||||
2025-05-09 | 12:34:14 | SG | 2025-06-20 | 42 | 14.9252 | Post-Earnings / SSR | |||||||||||
2025-05-09 | 11:18:46 | SG | 2025-05-16 | 7 | 15.41 | Post-Earnings / SSR | |||||||||||
2025-05-09 | 11:02:15 | SG | 2025-06-20 | 42 | 15.2545 | Post-Earnings / SSR | |||||||||||
2025-05-09 | 10:42:51 | SG | 2027-01-15 | 616 | 15.0552 | Post-Earnings / SSR | |||||||||||
2025-05-09 | 10:36:08 | SG | 2025-05-16 | 7 | 14.935 | Post-Earnings / SSR | |||||||||||
2025-05-09 | 10:35:52 | SG | 2025-05-16 | 7 | 14.8745 | Post-Earnings / SSR | |||||||||||
2025-05-09 | 10:35:53 | SG | 2025-05-16 | 7 | 14.855 | Post-Earnings / SSR | |||||||||||
2025-05-09 | 10:35:46 | SG | 2025-05-16 | 7 | 14.83 | Post-Earnings / SSR | |||||||||||
2025-05-09 | 10:31:10 | SG | 2027-01-15 | 616 | 14.84 | Post-Earnings / SSR | |||||||||||
2025-05-09 | 10:23:28 | SG | 2026-01-16 | 252 | 15.035 | Post-Earnings / SSR | |||||||||||
2025-05-09 | 09:54:38 | SG | 2025-06-20 | 42 | 15.5038 | Post-Earnings / SSR | |||||||||||
2025-05-09 | 09:48:18 | SG | 2025-05-16 | 7 | 15.545 | Post-Earnings / SSR | |||||||||||
2025-05-08 | 15:45:43 | SG | 2025-06-20 | 43 | 18.181 | Pre-Earnings | |||||||||||
2025-05-08 | 11:41:59 | SG | 2025-07-18 | 71 | 18.125 | Pre-Earnings | |||||||||||
2025-05-08 | 11:41:59 | SG | 2025-07-18 | 71 | 18.125 | Pre-Earnings | |||||||||||
2025-05-07 | 15:11:53 | SG | 2025-07-18 | 72 | 18.005 | ||||||||||||
2025-05-07 | 15:11:54 | SG | 2025-07-18 | 72 | 17.975 | ||||||||||||
2025-05-07 | 15:11:54 | SG | 2025-07-18 | 72 | 18.0 | ||||||||||||
2025-05-05 | 09:56:51 | SG | 2025-06-20 | 46 | 20.485 | ||||||||||||
2025-05-01 | 13:33:03 | SG | 2025-06-20 | 50 | 19.85 | ||||||||||||
2025-05-01 | 12:03:07 | SG | 2025-06-20 | 50 | 19.7508 | ||||||||||||
2025-04-30 | 15:34:15 | SG | 2025-07-18 | 79 | 19.34 | ||||||||||||
2025-04-29 | 15:29:11 | SG | 2025-05-16 | 17 | 19.16 | ||||||||||||
2025-04-29 | 15:29:11 | SG | 2025-05-16 | 17 | 19.16 | ||||||||||||
2025-04-29 | 15:29:11 | SG | 2025-05-16 | 17 | 19.13 | ||||||||||||
2025-04-29 | 15:29:11 | SG | 2025-05-16 | 17 | 19.135 | ||||||||||||
2025-04-29 | 15:29:11 | SG | 2025-05-16 | 17 | 19.1351 | ||||||||||||
2025-04-23 | 09:34:38 | SG | 2025-07-18 | 86 | 18.4493 | ||||||||||||
2025-04-23 | 09:34:38 | SG | 2025-07-18 | 86 | 18.45 | ||||||||||||
2025-04-17 | 10:55:32 | SG | 2025-07-18 | 92 | 18.7297 | ||||||||||||
2025-04-17 | 10:54:46 | SG | 2025-07-18 | 92 | 18.685 | ||||||||||||
2025-04-17 | 10:54:46 | SG | 2025-07-18 | 92 | 18.725 | ||||||||||||
2025-04-16 | 12:07:23 | SG | 2026-01-16 | 275 | 20.225 | ||||||||||||
2025-04-15 | 12:43:43 | SG | 2025-04-17 | 2 | 20.475 | ||||||||||||
2025-04-15 | 09:49:25 | SG | 2025-10-17 | 185 | 21.4847 | ||||||||||||
2025-04-14 | 14:32:39 | SG | 2026-01-16 | 277 | 20.815 | SSR | |||||||||||
2025-04-11 | 10:25:32 | SG | 2025-07-18 | 98 | 20.3147 | ||||||||||||
2025-04-10 | 15:36:14 | SG | 2025-07-18 | 99 | 21.9115 | ||||||||||||
2025-04-10 | 15:36:14 | SG | 2025-07-18 | 99 | 21.9115 | ||||||||||||
2025-04-10 | 09:44:17 | SG | 2025-10-17 | 190 | 21.6451 | ||||||||||||
2025-04-10 | 09:39:01 | SG | 2025-10-17 | 190 | 21.7203 | ||||||||||||
2025-04-10 | 09:35:28 | SG | 2025-10-17 | 190 | 21.8401 | ||||||||||||
2025-04-10 | 09:34:20 | SG | 2025-10-17 | 190 | 21.92 | ||||||||||||
2025-04-10 | 09:34:18 | SG | 2025-10-17 | 190 | 21.9996 | ||||||||||||
2025-04-09 | 13:17:57 | SG | 2025-10-17 | 191 | 19.9594 | ||||||||||||
2025-04-04 | 14:40:32 | SG | 2025-04-17 | 13 | 20.71 | SSR | |||||||||||
2025-04-04 | 10:01:53 | SG | 2025-04-17 | 13 | 20.225 | SSR | |||||||||||
2025-04-04 | 10:01:53 | SG | 2025-04-17 | 13 | 20.225 | SSR | |||||||||||
2025-04-04 | 10:01:53 | SG | 2025-04-17 | 13 | 20.225 | SSR | |||||||||||
2025-04-03 | 10:22:01 | SG | 2025-04-17 | 14 | 22.29 | SSR | |||||||||||
2025-04-01 | 15:34:04 | SG | 2025-07-18 | 108 | 25.475 | ||||||||||||
2025-03-28 | 10:09:55 | SG | 2025-04-17 | 20 | 26.225 | ||||||||||||
2025-03-26 | 15:59:26 | SG | 2025-07-18 | 114 | 26.315 | ||||||||||||
2025-03-26 | 15:59:26 | SG | 2025-07-18 | 114 | 26.315 | ||||||||||||
2025-03-21 | 09:34:04 | SG | 2025-04-17 | 27 | 23.79 | ||||||||||||
2025-03-18 | 15:53:44 | SG | 2025-03-21 | 3 | 23.765 | ||||||||||||
2025-03-18 | 10:11:26 | SG | 2025-03-21 | 3 | 23.68 | ||||||||||||
2025-03-18 | 10:11:24 | SG | 2025-03-21 | 3 | 23.68 | ||||||||||||
2025-03-18 | 10:11:25 | SG | 2025-03-21 | 3 | 23.68 | ||||||||||||
2025-03-14 | 09:49:38 | SG | 2025-03-21 | 7 | 24.2448 | ||||||||||||
2025-03-14 | 09:49:38 | SG | 2025-03-21 | 7 | 24.2448 | ||||||||||||
2025-03-12 | 13:31:04 | SG | 2025-03-21 | 9 | 24.94 | ||||||||||||
2025-03-12 | 13:31:04 | SG | 2025-03-21 | 9 | 24.94 | ||||||||||||
2025-03-11 | 10:36:32 | SG | 2025-03-21 | 10 | 23.895 | ||||||||||||
2025-03-11 | 10:36:33 | SG | 2025-03-21 | 10 | 23.745 | ||||||||||||
2025-03-11 | 10:36:33 | SG | 2025-03-21 | 10 | 23.745 | ||||||||||||
2025-03-10 | 09:37:45 | SG | 2025-03-21 | 11 | 23.35 | ||||||||||||
2025-03-10 | 09:36:51 | SG | 2025-03-21 | 11 | 23.53 | ||||||||||||
2025-03-06 | 12:37:55 | SG | 2025-03-21 | 15 | 24.245 | ||||||||||||
2025-03-06 | 09:36:53 | SG | 2025-03-21 | 15 | 23.045 | ||||||||||||
2025-03-06 | 09:36:47 | SG | 2025-03-21 | 15 | 23.065 | ||||||||||||
2025-03-06 | 09:36:28 | SG | 2025-03-21 | 15 | 23.0604 | ||||||||||||
2025-03-05 | 15:43:25 | SG | 2025-03-21 | 16 | 22.84 | ||||||||||||
2025-03-04 | 11:29:03 | SG | 2025-03-21 | 17 | 20.1947 | ||||||||||||
2025-03-04 | 11:29:03 | SG | 2025-03-21 | 17 | 20.1947 | ||||||||||||
2025-03-04 | 11:25:01 | SG | 2025-03-21 | 17 | 20.119 | ||||||||||||
2025-03-04 | 11:25:02 | SG | 2025-03-21 | 17 | 20.175 | ||||||||||||
2025-03-04 | 11:25:02 | SG | 2025-03-21 | 17 | 20.175 | ||||||||||||
2025-03-04 | 11:25:02 | SG | 2025-03-21 | 17 | 20.1721 | ||||||||||||
2025-03-04 | 11:25:01 | SG | 2025-03-21 | 17 | 20.1051 | ||||||||||||
2025-03-04 | 11:25:01 | SG | 2025-03-21 | 17 | 20.119 | ||||||||||||
2025-03-04 | 09:31:52 | SG | 2025-04-17 | 44 | 20.7007 | ||||||||||||
2025-03-03 | 09:35:26 | SG | 2025-03-21 | 18 | 22.875 | ||||||||||||
2025-02-28 | 11:20:32 | SG | 2025-03-21 | 21 | 23.175 | ||||||||||||
2025-02-27 | 14:29:06 | SG | 2027-01-15 | 687 | 23.025 | Post-Earnings | |||||||||||
2025-02-27 | 11:55:53 | SG | 2026-01-16 | 323 | 23.515 | Post-Earnings | |||||||||||
2025-02-27 | 11:55:50 | SG | 2025-03-21 | 22 | 23.515 | Post-Earnings | |||||||||||
2025-02-27 | 11:55:50 | SG | 2025-03-21 | 22 | 23.515 | Post-Earnings | |||||||||||
2025-02-27 | 10:29:02 | SG | 2025-03-21 | 22 | 24.7043 | Post-Earnings | |||||||||||
2025-02-27 | 10:19:19 | SG | 2025-03-21 | 22 | 22.955 | Post-Earnings | |||||||||||
2025-02-27 | 09:33:25 | SG | 2025-03-21 | 22 | 22.3449 | Post-Earnings | |||||||||||
2025-02-26 | 15:18:21 | SG | 2025-03-21 | 23 | 23.21 | Pre-Earnings | |||||||||||
2025-02-26 | 15:04:47 | SG | 2025-03-21 | 23 | 23.026 | Pre-Earnings | |||||||||||
2025-02-26 | 15:04:47 | SG | 2025-03-21 | 23 | 23.025 | Pre-Earnings | |||||||||||
2025-02-26 | 14:47:06 | SG | 2025-03-21 | 23 | 23.185 | Pre-Earnings | |||||||||||
2025-02-26 | 14:46:10 | SG | 2025-03-21 | 23 | 23.11 | Pre-Earnings | |||||||||||
2025-02-26 | 14:21:48 | SG | 2025-07-18 | 142 | 23.29 | Pre-Earnings | |||||||||||
2025-02-26 | 14:21:48 | SG | 2025-07-18 | 142 | 23.29 | Pre-Earnings | |||||||||||
2025-02-26 | 14:21:41 | SG | 2025-07-18 | 142 | 23.285 | Pre-Earnings | |||||||||||
2025-02-26 | 14:21:41 | SG | 2025-07-18 | 142 | 23.285 | Pre-Earnings | |||||||||||
2025-02-26 | 14:15:58 | SG | 2025-07-18 | 142 | 23.195 | Pre-Earnings | |||||||||||
2025-02-26 | 14:15:58 | SG | 2025-07-18 | 142 | 23.195 | Pre-Earnings | |||||||||||
2025-02-26 | 14:15:32 | SG | 2025-07-18 | 142 | 23.2248 | Pre-Earnings | |||||||||||
2025-02-26 | 14:13:33 | SG | 2025-07-18 | 142 | 23.1452 | Pre-Earnings | |||||||||||
2025-02-26 | 13:30:59 | SG | 2025-03-21 | 23 | 23.385 | Pre-Earnings | |||||||||||
2025-02-26 | 13:11:30 | SG | 2025-03-21 | 23 | 23.4 | Pre-Earnings | |||||||||||
2025-02-26 | 13:10:07 | SG | 2025-03-21 | 23 | 23.425 | Pre-Earnings | |||||||||||
2025-02-26 | 12:38:25 | SG | 2025-03-21 | 23 | 23.3894 | Pre-Earnings | |||||||||||
2025-02-26 | 12:01:26 | SG | 2025-03-21 | 23 | 23.51 | Pre-Earnings | |||||||||||
2025-02-26 | 11:43:56 | SG | 2025-03-21 | 23 | 23.475 | Pre-Earnings | |||||||||||
2025-02-26 | 11:43:56 | SG | 2025-03-21 | 23 | 23.455 | Pre-Earnings | |||||||||||
2025-02-26 | 11:43:56 | SG | 2025-03-21 | 23 | 23.475 | Pre-Earnings | |||||||||||
2025-02-26 | 11:40:17 | SG | 2025-03-21 | 23 | 23.5149 | Pre-Earnings | |||||||||||
2025-02-26 | 11:40:17 | SG | 2025-03-21 | 23 | 23.5149 | Pre-Earnings | |||||||||||
2025-02-26 | 10:38:34 | SG | 2025-03-21 | 23 | 23.15 | Pre-Earnings | |||||||||||
2025-02-26 | 10:34:11 | SG | 2025-03-21 | 23 | 22.9842 | Pre-Earnings | |||||||||||
2025-02-26 | 10:10:35 | SG | 2026-01-16 | 324 | 22.8239 | Pre-Earnings | |||||||||||
2025-02-25 | 14:39:01 | SG | 2025-03-21 | 24 | 22.2746 | ||||||||||||
2025-02-25 | 14:02:46 | SG | 2025-03-21 | 24 | 22.205 | ||||||||||||
2025-02-25 | 14:02:46 | SG | 2025-03-21 | 24 | 22.2 | ||||||||||||
2025-02-25 | 13:23:52 | SG | 2025-03-21 | 24 | 22.14 | ||||||||||||
2025-02-24 | 11:54:21 | SG | 2025-07-18 | 144 | 22.6948 | ||||||||||||
2025-02-24 | 11:44:09 | SG | 2025-07-18 | 144 | 22.735 | ||||||||||||
2025-02-21 | 12:49:38 | SG | 2025-03-21 | 28 | 22.075 | ||||||||||||
2025-02-21 | 12:49:38 | SG | 2025-03-21 | 28 | 22.0845 | ||||||||||||
2025-02-21 | 12:49:38 | SG | 2025-03-21 | 28 | 22.075 | ||||||||||||
2025-02-21 | 12:36:53 | SG | 2025-03-21 | 28 | 22.2552 | ||||||||||||
2025-02-21 | 12:36:53 | SG | 2025-03-21 | 28 | 22.25 | ||||||||||||
2025-02-21 | 12:36:53 | SG | 2025-03-21 | 28 | 22.2552 | ||||||||||||
2025-02-21 | 11:52:19 | SG | 2025-03-21 | 28 | 22.6958 | ||||||||||||
2025-02-21 | 11:52:19 | SG | 2025-03-21 | 28 | 22.6951 | ||||||||||||
2025-02-21 | 11:52:19 | SG | 2025-03-21 | 28 | 22.6958 | ||||||||||||
2025-02-21 | 10:06:35 | SG | 2025-03-21 | 28 | 23.22 | ||||||||||||
2025-02-19 | 14:35:34 | SG | 2025-02-21 | 2 | 23.5248 | ||||||||||||
2025-02-19 | 14:23:37 | SG | 2025-02-21 | 2 | 23.56 | ||||||||||||
2025-02-19 | 14:21:04 | SG | 2025-02-21 | 2 | 23.455 | ||||||||||||
2025-02-19 | 14:21:04 | SG | 2025-02-21 | 2 | 23.465 | ||||||||||||
2025-02-19 | 14:21:04 | SG | 2025-02-21 | 2 | 23.455 | ||||||||||||
2025-02-19 | 14:13:33 | SG | 2025-02-21 | 2 | 23.31 | ||||||||||||
2025-02-19 | 13:43:30 | SG | 2025-03-21 | 30 | 23.4339 | ||||||||||||
2025-02-19 | 13:43:30 | SG | 2025-03-21 | 30 | 23.4432 | ||||||||||||
2025-02-19 | 13:43:30 | SG | 2025-03-21 | 30 | 23.4339 | ||||||||||||
2025-02-18 | 15:59:50 | SG | 2025-03-21 | 31 | 24.6252 | ||||||||||||
2025-02-18 | 13:04:26 | SG | 2025-02-21 | 3 | 25.24 | ||||||||||||
2025-02-18 | 13:04:13 | SG | 2025-02-21 | 3 | 25.26 | ||||||||||||
2025-02-12 | 09:57:48 | SG | 2025-03-21 | 37 | 25.4538 | SSR | |||||||||||
2025-02-11 | 15:05:50 | SG | 2025-02-21 | 10 | 26.655 | ||||||||||||
2025-02-11 | 14:20:25 | SG | 2025-02-21 | 10 | 26.71 | ||||||||||||
2025-02-11 | 14:20:26 | SG | 2025-02-21 | 10 | 26.76 | ||||||||||||
2025-02-05 | 10:47:05 | SG | 2025-02-21 | 16 | 32.375 | ||||||||||||
2025-02-05 | 10:47:05 | SG | 2025-02-21 | 16 | 32.375 | ||||||||||||
2025-02-05 | 10:47:05 | SG | 2025-02-21 | 16 | 32.375 | ||||||||||||
2025-02-05 | 10:09:32 | SG | 2025-02-21 | 16 | 32.795 | ||||||||||||
2025-02-04 | 15:53:50 | SG | 2025-02-21 | 17 | 33.0 | ||||||||||||
2025-02-04 | 15:53:50 | SG | 2025-02-21 | 17 | 33.0 | ||||||||||||
2025-01-31 | 15:12:58 | SG | 2025-02-21 | 21 | 32.73 | ||||||||||||
2025-01-31 | 14:23:10 | SG | 2025-02-21 | 21 | 33.02 | ||||||||||||
2025-01-30 | 10:50:12 | SG | 2027-01-15 | 715 | 34.3751 | ||||||||||||
2025-01-30 | 10:50:12 | SG | 2027-01-15 | 715 | 34.375 | ||||||||||||
2025-01-29 | 14:46:15 | SG | 2026-01-16 | 352 | 33.84 | ||||||||||||
2025-01-29 | 14:37:04 | SG | 2025-02-21 | 23 | 33.455 | ||||||||||||
2025-01-29 | 14:15:28 | SG | 2025-02-21 | 23 | 33.605 | ||||||||||||
2025-01-29 | 14:04:33 | SG | 2025-03-21 | 51 | 33.7001 | ||||||||||||
2025-01-22 | 12:39:23 | SG | 2025-07-18 | 177 | 29.705 | ||||||||||||
2025-01-22 | 12:39:23 | SG | 2025-07-18 | 177 | 29.705 | ||||||||||||
2025-01-22 | 12:39:23 | SG | 2025-07-18 | 177 | 29.705 | ||||||||||||
2025-01-22 | 12:19:31 | SG | 2025-03-21 | 58 | 29.735 | ||||||||||||
2025-01-22 | 11:24:35 | SG | 2025-07-18 | 177 | 29.8776 | ||||||||||||
2025-01-22 | 11:24:13 | SG | 2025-07-18 | 177 | 29.74 | ||||||||||||
2025-01-22 | 11:24:13 | SG | 2025-07-18 | 177 | 29.74 | ||||||||||||
2025-01-07 | 15:22:40 | SG | 2025-04-17 | 100 | 32.01 | ||||||||||||
2025-01-06 | 13:50:54 | SG | 2025-01-17 | 11 | 35.9 | ||||||||||||
2025-01-06 | 13:50:54 | SG | 2025-01-17 | 11 | 35.9 | ||||||||||||
2025-01-06 | 12:38:37 | SG | 2025-01-17 | 11 | 35.095 | ||||||||||||
2025-01-03 | 12:43:02 | SG | 2025-01-17 | 14 | 32.2287 | ||||||||||||
2025-01-03 | 12:42:26 | SG | 2025-01-17 | 14 | 32.065 | ||||||||||||
2025-01-03 | 12:42:26 | SG | 2025-01-17 | 14 | 32.115 | ||||||||||||
2025-01-02 | 10:07:35 | SG | 2025-01-17 | 15 | 32.349 | ||||||||||||
2024-12-30 | 12:54:05 | SG | 2025-01-17 | 18 | 31.845 | ||||||||||||
2024-12-30 | 12:54:05 | SG | 2025-01-17 | 18 | 31.84 | ||||||||||||
2024-12-30 | 10:02:06 | SG | 2025-01-17 | 18 | 31.33 | ||||||||||||
2024-12-23 | 13:15:34 | SG | 2025-01-17 | 25 | 32.695 | ||||||||||||
2024-12-23 | 10:07:14 | SG | 2025-01-17 | 25 | 33.32 | ||||||||||||
2024-12-23 | 10:07:14 | SG | 2025-01-17 | 25 | 33.2501 | ||||||||||||
2024-12-13 | 13:43:08 | SG | 2024-12-20 | 7 | 34.5301 | ||||||||||||
2024-12-13 | 13:08:48 | SG | 2025-01-17 | 35 | 34.5802 | ||||||||||||
2024-12-13 | 13:07:57 | SG | 2025-01-17 | 35 | 34.525 | ||||||||||||
2024-12-13 | 11:29:51 | SG | 2025-01-17 | 35 | 34.61 | ||||||||||||
2024-12-13 | 11:29:41 | SG | 2025-01-17 | 35 | 34.6053 | ||||||||||||
2024-12-13 | 11:26:49 | SG | 2025-01-17 | 35 | 34.7351 | ||||||||||||
2024-12-12 | 10:11:07 | SG | 2025-01-17 | 36 | 38.445 | ||||||||||||
2024-12-12 | 09:57:02 | SG | 2025-01-17 | 36 | 38.46 | ||||||||||||
2024-12-10 | 15:28:02 | SG | 2024-12-20 | 10 | 36.3801 | SSR | |||||||||||
2024-12-10 | 15:26:05 | SG | 2024-12-20 | 10 | 36.395 | SSR | |||||||||||
2024-12-10 | 15:26:01 | SG | 2024-12-20 | 10 | 36.39 | SSR | |||||||||||
2024-12-10 | 15:26:01 | SG | 2024-12-20 | 10 | 36.39 | SSR | |||||||||||
2024-12-10 | 15:20:44 | SG | 2024-12-20 | 10 | 36.33 | SSR | |||||||||||
2024-12-09 | 12:57:43 | SG | 2024-12-20 | 11 | 37.2706 | SSR | |||||||||||
2024-12-09 | 10:06:19 | SG | 2024-12-20 | 11 | 39.3089 | ||||||||||||
2024-12-06 | 15:54:51 | SG | 2025-01-17 | 42 | 41.99 | ||||||||||||
2024-12-06 | 15:36:29 | SG | 2024-12-20 | 14 | 41.61 | ||||||||||||
2024-12-06 | 15:32:21 | SG | 2025-01-17 | 42 | 41.44 | ||||||||||||
2024-12-06 | 15:32:21 | SG | 2025-01-17 | 42 | 41.47 | ||||||||||||
2024-12-06 | 15:32:21 | SG | 2025-01-17 | 42 | 41.47 | ||||||||||||
2024-12-06 | 15:32:07 | SG | 2024-12-20 | 14 | 41.435 | ||||||||||||
2024-12-06 | 15:30:27 | SG | 2025-01-17 | 42 | 41.425 | ||||||||||||
2024-12-06 | 15:30:27 | SG | 2025-01-17 | 42 | 41.425 | ||||||||||||
2024-12-06 | 13:25:19 | SG | 2024-12-20 | 14 | 41.3 | ||||||||||||
2024-12-06 | 13:24:36 | SG | 2024-12-20 | 14 | 40.9145 | ||||||||||||
2024-12-06 | 13:24:36 | SG | 2024-12-20 | 14 | 40.915 | ||||||||||||
2024-12-04 | 10:54:13 | SG | 2024-12-20 | 16 | 40.4677 | ||||||||||||
2024-12-04 | 10:26:06 | SG | 2025-01-17 | 44 | 40.0045 | ||||||||||||
2024-12-04 | 10:26:06 | SG | 2025-01-17 | 44 | 40.0095 | ||||||||||||
2024-12-04 | 10:26:06 | SG | 2025-01-17 | 44 | 40.0045 | ||||||||||||
2024-12-03 | 15:25:49 | SG | 2025-01-17 | 45 | 38.5295 | ||||||||||||
2024-12-03 | 14:18:53 | SG | 2025-01-17 | 45 | 38.733 | ||||||||||||
2024-12-03 | 14:18:53 | SG | 2025-01-17 | 45 | 38.73 | ||||||||||||
2024-11-26 | 14:54:24 | SG | 2024-12-20 | 24 | 42.795 | ||||||||||||
2024-11-26 | 14:54:24 | SG | 2024-12-20 | 24 | 42.7349 | ||||||||||||
2024-11-26 | 14:54:24 | SG | 2024-12-20 | 24 | 42.785 | ||||||||||||
2024-11-26 | 13:36:48 | SG | 2025-01-17 | 52 | 42.5951 | ||||||||||||
2024-11-25 | 14:22:55 | SG | 2024-12-20 | 25 | 44.8693 | ||||||||||||
2024-11-25 | 09:58:24 | SG | 2026-01-16 | 417 | 44.3551 | ||||||||||||
2024-11-22 | 14:31:03 | SG | 2024-12-20 | 28 | 43.8465 | ||||||||||||
2024-11-22 | 13:09:40 | SG | 2024-12-20 | 28 | 43.34 | ||||||||||||
2024-11-22 | 12:39:42 | SG | 2025-01-17 | 56 | 43.2657 | ||||||||||||
2024-11-22 | 12:26:08 | SG | 2024-12-20 | 28 | 43.1548 | ||||||||||||
2024-11-22 | 12:26:08 | SG | 2024-12-20 | 28 | 43.31 | ||||||||||||
2024-11-22 | 12:24:33 | SG | 2024-12-20 | 28 | 43.0799 | ||||||||||||
2024-11-22 | 12:24:33 | SG | 2024-12-20 | 28 | 43.08 | ||||||||||||
2024-11-22 | 12:24:00 | SG | 2024-12-20 | 28 | 42.9942 | ||||||||||||
2024-11-22 | 12:22:44 | SG | 2024-12-20 | 28 | 42.84 | ||||||||||||
2024-11-22 | 12:21:18 | SG | 2025-01-17 | 56 | 42.7576 | ||||||||||||
2024-11-21 | 15:46:57 | SG | 2024-12-20 | 29 | 40.9 | ||||||||||||
2024-11-21 | 14:20:42 | SG | 2025-01-17 | 57 | 40.53 | ||||||||||||
2024-11-21 | 13:07:35 | SG | 2025-01-17 | 57 | 39.7957 | ||||||||||||
2024-11-21 | 12:12:54 | SG | 2025-01-17 | 57 | 39.3926 | ||||||||||||
2024-11-19 | 15:36:42 | SG | 2024-12-20 | 31 | 37.45 | ||||||||||||
2024-11-19 | 14:50:20 | SG | 2024-12-20 | 31 | 36.94 | ||||||||||||
2024-11-19 | 13:39:38 | SG | 2025-01-17 | 59 | 36.4063 | ||||||||||||
2024-11-19 | 13:39:38 | SG | 2025-01-17 | 59 | 36.4063 | ||||||||||||
2024-11-19 | 11:59:46 | SG | 2024-12-20 | 31 | 36.11 | ||||||||||||
2024-11-19 | 11:57:40 | SG | 2024-12-20 | 31 | 36.11 | ||||||||||||
2024-11-19 | 11:50:14 | SG | 2024-12-20 | 31 | 35.99 | ||||||||||||
2024-11-19 | 11:17:01 | SG | 2025-01-17 | 59 | 35.84 | ||||||||||||
2024-11-14 | 15:05:37 | SG | 2024-11-15 | 1 | 34.125 | ||||||||||||
2024-11-14 | 13:13:01 | SG | 2025-01-17 | 64 | 34.61 | ||||||||||||
2024-11-14 | 12:52:55 | SG | 2024-11-15 | 1 | 34.665 | ||||||||||||
2024-11-14 | 12:49:35 | SG | 2024-11-15 | 1 | 34.4253 | ||||||||||||
2024-11-14 | 12:15:32 | SG | 2025-01-17 | 64 | 34.8704 | ||||||||||||
2024-11-14 | 12:15:32 | SG | 2025-01-17 | 64 | 34.87 | ||||||||||||
2024-11-14 | 12:15:04 | SG | 2025-01-17 | 64 | 34.8813 | ||||||||||||
2024-11-14 | 12:15:04 | SG | 2025-01-17 | 64 | 34.8813 | ||||||||||||
2024-11-14 | 10:51:49 | SG | 2025-01-17 | 64 | 35.073 | ||||||||||||
2024-11-14 | 10:51:48 | SG | 2025-01-17 | 64 | 35.1225 | ||||||||||||
2024-11-14 | 10:22:25 | SG | 2025-01-17 | 64 | 35.0367 | ||||||||||||
2024-11-14 | 10:22:25 | SG | 2025-01-17 | 64 | 35.0367 | ||||||||||||
2024-11-13 | 15:39:12 | SG | 2024-11-15 | 2 | 36.215 | ||||||||||||
2024-11-13 | 15:09:34 | SG | 2024-11-15 | 2 | 36.095 | ||||||||||||
2024-11-13 | 14:41:17 | SG | 2024-11-15 | 2 | 36.5611 | ||||||||||||
2024-11-13 | 14:33:29 | SG | 2024-11-15 | 2 | 36.71 | ||||||||||||
2024-11-13 | 14:19:31 | SG | 2024-11-15 | 2 | 36.605 | ||||||||||||
2024-11-13 | 14:03:56 | SG | 2024-11-15 | 2 | 37.06 | ||||||||||||
2024-11-13 | 13:45:08 | SG | 2024-11-15 | 2 | 37.5598 | ||||||||||||
2024-11-13 | 09:41:13 | SG | 2024-11-15 | 2 | 39.2245 | ||||||||||||
2024-11-13 | 09:41:13 | SG | 2024-11-15 | 2 | 39.1172 | ||||||||||||
2024-11-13 | 09:41:13 | SG | 2024-11-15 | 2 | 39.2245 | ||||||||||||
2024-11-12 | 09:57:43 | SG | 2024-12-20 | 38 | 39.5483 | ||||||||||||
2024-11-12 | 09:57:43 | SG | 2024-12-20 | 38 | 39.5689 | ||||||||||||
2024-11-12 | 09:40:25 | SG | 2024-12-20 | 38 | 40.3586 | ||||||||||||
2024-11-12 | 09:38:28 | SG | 2024-12-20 | 38 | 40.165 | ||||||||||||
2024-11-12 | 09:37:20 | SG | 2024-11-15 | 3 | 39.7853 | ||||||||||||
2024-11-11 | 10:55:09 | SG | 2024-12-20 | 39 | 40.125 | SSR | |||||||||||
2024-11-11 | 10:10:13 | SG | 2024-11-15 | 4 | 38.24 | SSR | |||||||||||
2024-11-08 | 14:56:37 | SG | 2025-01-17 | 70 | 38.4603 | Post-Earnings / SSR | |||||||||||
2024-11-08 | 13:00:58 | SG | 2025-01-17 | 70 | 38.59 | Post-Earnings / SSR | |||||||||||
2024-11-08 | 11:30:22 | SG | 2024-11-15 | 7 | 41.2671 | Post-Earnings / SSR | |||||||||||
2024-11-08 | 11:13:03 | SG | 2024-11-15 | 7 | 42.1692 | Post-Earnings / SSR | |||||||||||
2024-11-08 | 10:56:19 | SG | 2024-11-15 | 7 | 41.6 | Post-Earnings / SSR | |||||||||||
2024-11-08 | 10:56:19 | SG | 2024-11-15 | 7 | 41.5799 | Post-Earnings / SSR | |||||||||||
2024-11-08 | 10:56:19 | SG | 2024-11-15 | 7 | 41.5789 | Post-Earnings / SSR | |||||||||||
2024-11-08 | 10:56:05 | SG | 2024-11-15 | 7 | 41.468 | Post-Earnings / SSR | |||||||||||
2024-11-08 | 10:55:21 | SG | 2024-11-15 | 7 | 41.725 | Post-Earnings / SSR | |||||||||||
2024-11-08 | 10:55:21 | SG | 2024-11-15 | 7 | 41.725 | Post-Earnings / SSR | |||||||||||
2024-11-08 | 10:38:33 | SG | 2024-11-15 | 7 | 40.785 | Post-Earnings / SSR | |||||||||||
2024-11-08 | 10:04:02 | SG | 2024-11-15 | 7 | 39.105 | Post-Earnings / SSR | |||||||||||
2024-11-08 | 10:03:02 | SG | 2026-01-16 | 434 | 38.8001 | Post-Earnings / SSR | |||||||||||
2024-11-08 | 09:56:01 | SG | 2024-11-15 | 7 | 38.795 | Post-Earnings / SSR | |||||||||||
2024-11-07 | 15:56:35 | SG | 2024-12-20 | 43 | 42.1781 | Pre-Earnings | |||||||||||
2024-11-07 | 11:50:24 | SG | 2024-11-15 | 8 | 42.2403 | Pre-Earnings | |||||||||||
2024-11-07 | 10:23:30 | SG | 2024-11-15 | 8 | 41.83 | Pre-Earnings | |||||||||||
2024-11-07 | 09:57:00 | SG | 2024-11-15 | 8 | 41.8648 | Pre-Earnings | |||||||||||
2024-11-07 | 09:57:00 | SG | 2024-11-15 | 8 | 41.865 | Pre-Earnings | |||||||||||
2024-11-07 | 09:43:45 | SG | 2024-11-15 | 8 | 41.855 | Pre-Earnings | |||||||||||
2024-11-06 | 13:18:46 | SG | 2025-01-17 | 72 | 40.585 | ||||||||||||
2024-11-06 | 13:18:47 | SG | 2025-01-17 | 72 | 40.4789 | ||||||||||||
2024-11-05 | 15:42:24 | SG | 2024-11-15 | 10 | 38.89 | ||||||||||||
2024-11-05 | 15:08:34 | SG | 2024-12-20 | 45 | 38.9853 | ||||||||||||
2024-11-05 | 15:08:34 | SG | 2024-12-20 | 45 | 38.9051 | ||||||||||||
2024-11-05 | 14:35:14 | SG | 2024-12-20 | 45 | 39.2186 | ||||||||||||
2024-11-05 | 09:53:24 | SG | 2025-04-17 | 163 | 39.74 | ||||||||||||
2024-11-01 | 15:17:50 | SG | 2024-11-15 | 14 | 37.87 | ||||||||||||
2024-11-01 | 10:08:12 | SG | 2024-11-15 | 14 | 36.54 | ||||||||||||
2024-11-01 | 10:08:13 | SG | 2024-11-15 | 14 | 36.54 | ||||||||||||
2024-11-01 | 09:57:51 | SG | 2024-11-15 | 14 | 36.8075 | ||||||||||||
2024-11-01 | 09:55:49 | SG | 2024-11-15 | 14 | 36.34 | ||||||||||||
2024-11-01 | 09:55:49 | SG | 2024-11-15 | 14 | 36.44 | ||||||||||||
2024-10-31 | 15:48:00 | SG | 2025-01-17 | 78 | 36.105 | ||||||||||||
2024-10-31 | 15:48:00 | SG | 2025-01-17 | 78 | 36.105 | ||||||||||||
2024-10-31 | 15:47:31 | SG | 2025-01-17 | 78 | 36.0217 | ||||||||||||
2024-10-31 | 15:44:39 | SG | 2024-11-15 | 15 | 35.8794 | ||||||||||||
2024-10-31 | 11:05:01 | SG | 2025-04-17 | 168 | 35.5867 | ||||||||||||
2024-10-31 | 11:04:10 | SG | 2024-12-20 | 50 | 35.6543 | ||||||||||||
2024-10-31 | 10:33:56 | SG | 2024-12-20 | 50 | 36.6162 | ||||||||||||
2024-10-31 | 10:33:17 | SG | 2024-11-15 | 15 | 36.6289 | ||||||||||||
2024-10-30 | 13:35:16 | SG | 2024-11-15 | 16 | 37.49 | ||||||||||||
2024-10-30 | 13:34:19 | SG | 2024-11-15 | 16 | 37.42 | ||||||||||||
2024-10-28 | 14:09:09 | SG | 2024-11-15 | 18 | 39.5772 | ||||||||||||
2024-10-28 | 14:07:37 | SG | 2024-11-15 | 18 | 39.61 | ||||||||||||
2024-10-25 | 13:07:40 | SG | 2024-11-15 | 21 | 38.227 | ||||||||||||
2024-10-25 | 10:19:48 | SG | 2024-11-15 | 21 | 38.265 | ||||||||||||
2024-10-18 | 11:05:25 | SG | 2024-11-15 | 28 | 35.1148 | ||||||||||||
2024-10-17 | 14:40:30 | SG | 2024-10-18 | 1 | 35.7253 | ||||||||||||
2024-10-15 | 10:14:52 | SG | 2024-10-18 | 3 | 38.315 | ||||||||||||
2024-10-11 | 15:34:01 | SG | 2024-10-18 | 7 | 37.4497 | ||||||||||||
2024-10-11 | 15:33:55 | SG | 2024-10-18 | 7 | 37.4875 | ||||||||||||
2024-10-11 | 15:33:55 | SG | 2024-10-18 | 7 | 37.4311 | ||||||||||||
2024-10-11 | 09:43:10 | SG | 2024-10-18 | 7 | 38.13 | ||||||||||||
2024-10-11 | 09:43:07 | SG | 2024-10-18 | 7 | 38.0824 | ||||||||||||
2024-10-10 | 15:04:47 | SG | 2024-11-15 | 36 | 36.265 | ||||||||||||
2024-10-10 | 14:59:11 | SG | 2025-01-17 | 99 | 36.3 | ||||||||||||
2024-10-10 | 09:48:57 | SG | 2024-10-18 | 8 | 36.22 | ||||||||||||
2024-10-10 | 09:48:57 | SG | 2024-10-18 | 8 | 36.22 | ||||||||||||
2024-10-10 | 09:48:54 | SG | 2024-10-18 | 8 | 36.225 | ||||||||||||
2024-10-10 | 09:48:38 | SG | 2024-10-18 | 8 | 36.2498 | ||||||||||||
2024-10-10 | 09:48:33 | SG | 2024-10-18 | 8 | 36.1745 | ||||||||||||
2024-10-09 | 12:34:17 | SG | 2025-01-17 | 100 | 36.945 | ||||||||||||
2024-10-08 | 13:05:12 | SG | 2024-10-18 | 10 | 37.615 | ||||||||||||
2024-10-08 | 12:04:28 | SG | 2026-01-16 | 465 | 37.7503 | ||||||||||||
2024-10-08 | 11:37:51 | SG | 2024-10-18 | 10 | 36.935 | ||||||||||||
2024-10-08 | 11:37:48 | SG | 2024-10-18 | 10 | 36.915 | ||||||||||||
2024-10-08 | 11:37:48 | SG | 2024-10-18 | 10 | 36.915 | ||||||||||||
2024-10-08 | 11:21:52 | SG | 2024-10-18 | 10 | 36.795 | ||||||||||||
2024-10-08 | 11:21:40 | SG | 2024-10-18 | 10 | 36.71 | ||||||||||||
2024-10-08 | 11:21:40 | SG | 2024-10-18 | 10 | 36.73 | ||||||||||||
2024-10-04 | 12:45:28 | SG | 2025-07-18 | 287 | 35.07 | ||||||||||||
2024-10-04 | 12:38:39 | SG | 2026-01-16 | 469 | 34.925 | ||||||||||||
2024-09-30 | 09:51:07 | SG | 2024-10-18 | 18 | 37.26 | ||||||||||||
2024-09-30 | 09:51:07 | SG | 2024-10-18 | 18 | 37.26 | ||||||||||||
2024-09-27 | 14:28:14 | SG | 2024-10-18 | 21 | 36.17 | ||||||||||||
2024-09-27 | 10:40:43 | SG | 2024-10-18 | 21 | 35.415 | ||||||||||||
2024-09-23 | 15:11:59 | SG | 2024-10-18 | 25 | 35.86 | ||||||||||||
2024-09-20 | 13:38:37 | SG | 2025-01-17 | 119 | 36.84 | ||||||||||||
2024-09-20 | 13:38:37 | SG | 2025-01-17 | 119 | 36.84 | ||||||||||||
2024-09-19 | 13:05:49 | SG | 2024-09-20 | 1 | 36.57 | ||||||||||||
2024-09-19 | 13:05:40 | SG | 2024-09-20 | 1 | 36.6 | ||||||||||||
2024-09-18 | 14:08:14 | SG | 2024-09-20 | 2 | 34.28 | ||||||||||||
2024-09-16 | 12:15:40 | SG | 2024-09-20 | 4 | 33.26 | ||||||||||||
2024-09-16 | 10:56:24 | SG | 2024-09-20 | 4 | 33.77 | ||||||||||||
2024-09-13 | 12:06:13 | SG | 2024-09-20 | 7 | 35.52 | ||||||||||||
2024-09-13 | 12:05:53 | SG | 2024-09-20 | 7 | 35.62 | ||||||||||||
2024-09-13 | 11:02:12 | SG | 2024-09-20 | 7 | 35.58 | ||||||||||||
2024-09-11 | 14:06:41 | SG | 2026-01-16 | 492 | 31.8746 | ||||||||||||
2024-09-11 | 11:50:37 | SG | 2024-09-20 | 9 | 31.95 | ||||||||||||
2024-09-10 | 11:51:07 | SG | 2024-09-20 | 10 | 28.625 | ||||||||||||
2024-09-10 | 11:05:12 | SG | 2024-09-20 | 10 | 28.212 | ||||||||||||
2024-09-06 | 13:42:08 | SG | 2024-09-20 | 14 | 27.645 | ||||||||||||
2024-09-06 | 12:45:41 | SG | 2024-09-20 | 14 | 27.52 | ||||||||||||
2024-09-05 | 15:54:38 | SG | 2024-09-20 | 15 | 28.55 | ||||||||||||
2024-09-05 | 13:46:44 | SG | 2024-09-20 | 15 | 27.955 | ||||||||||||
2024-09-05 | 13:43:11 | SG | 2024-09-20 | 15 | 28.0848 | ||||||||||||
2024-09-05 | 13:38:13 | SG | 2024-09-20 | 15 | 28.35 | ||||||||||||
2024-09-05 | 13:19:42 | SG | 2024-09-20 | 15 | 29.22 | ||||||||||||
2024-09-05 | 13:19:42 | SG | 2024-09-20 | 15 | 29.22 | ||||||||||||
2024-09-05 | 13:16:48 | SG | 2024-09-20 | 15 | 29.42 | ||||||||||||
2024-09-05 | 13:12:30 | SG | 2024-09-20 | 15 | 29.765 | ||||||||||||
2024-09-05 | 13:11:00 | SG | 2024-09-20 | 15 | 29.705 | ||||||||||||
2024-09-05 | 13:07:51 | SG | 2024-09-20 | 15 | 29.615 | ||||||||||||
2024-09-05 | 13:07:51 | SG | 2024-09-20 | 15 | 29.615 | ||||||||||||
2024-09-05 | 13:07:33 | SG | 2024-09-20 | 15 | 29.585 | ||||||||||||
2024-09-05 | 13:07:33 | SG | 2024-09-20 | 15 | 29.585 | ||||||||||||
2024-09-05 | 13:07:33 | SG | 2024-09-20 | 15 | 29.585 | ||||||||||||
2024-09-05 | 13:07:25 | SG | 2024-09-20 | 15 | 29.555 | ||||||||||||
2024-09-03 | 15:39:12 | SG | 2024-09-20 | 17 | 29.15 | ||||||||||||
2024-09-03 | 14:03:55 | SG | 2024-09-20 | 17 | 29.29 | ||||||||||||
2024-09-03 | 14:03:55 | SG | 2024-09-20 | 17 | 29.29 | ||||||||||||
2024-09-03 | 13:48:51 | SG | 2024-09-20 | 17 | 29.345 | ||||||||||||
2024-09-03 | 13:17:41 | SG | 2025-01-17 | 136 | 29.475 | ||||||||||||
2024-09-03 | 09:52:14 | SG | 2024-09-20 | 17 | 30.2959 | ||||||||||||
2024-09-03 | 09:52:14 | SG | 2024-09-20 | 17 | 30.2959 | ||||||||||||
2024-08-28 | 10:31:16 | SG | 2024-10-18 | 51 | 33.39 | ||||||||||||
2024-08-26 | 14:46:58 | SG | 2024-09-20 | 25 | 34.995 | ||||||||||||
2024-08-26 | 14:46:58 | SG | 2024-09-20 | 25 | 35.035 | ||||||||||||
2024-08-26 | 13:40:30 | SG | 2024-09-20 | 25 | 34.99 | ||||||||||||
2024-08-26 | 13:40:19 | SG | 2024-09-20 | 25 | 35.055 | ||||||||||||
2024-08-26 | 13:39:53 | SG | 2024-09-20 | 25 | 35.0556 | ||||||||||||
2024-08-26 | 13:39:08 | SG | 2024-09-20 | 25 | 35.23 | ||||||||||||
2024-08-26 | 13:38:44 | SG | 2024-09-20 | 25 | 35.285 | ||||||||||||
2024-08-26 | 13:38:34 | SG | 2024-09-20 | 25 | 35.28 | ||||||||||||
2024-08-26 | 13:38:09 | SG | 2024-09-20 | 25 | 35.28 | ||||||||||||
2024-08-26 | 13:38:09 | SG | 2024-09-20 | 25 | 35.28 | ||||||||||||
2024-08-26 | 10:20:24 | SG | 2024-09-20 | 25 | 35.4436 | ||||||||||||
2024-08-26 | 10:20:00 | SG | 2024-09-20 | 25 | 35.465 | ||||||||||||
2024-08-26 | 09:46:32 | SG | 2024-09-20 | 25 | 35.91 | ||||||||||||
2024-08-26 | 09:40:23 | SG | 2024-09-20 | 25 | 36.25 | ||||||||||||
2024-08-23 | 13:27:34 | SG | 2024-09-20 | 28 | 37.7419 | ||||||||||||
2024-08-23 | 13:03:53 | SG | 2024-09-20 | 28 | 37.85 | ||||||||||||
2024-08-22 | 11:31:39 | SG | 2024-09-20 | 29 | 35.83 | ||||||||||||
2024-08-22 | 10:28:18 | SG | 2024-10-18 | 57 | 35.675 | ||||||||||||
2024-08-21 | 14:53:24 | SG | 2024-10-18 | 58 | 34.57 | ||||||||||||
2024-08-21 | 12:17:26 | SG | 2024-09-20 | 30 | 34.03 | ||||||||||||
2024-08-15 | 13:01:31 | SG | 2025-04-17 | 245 | 35.54 | ||||||||||||
2024-08-12 | 12:44:27 | SG | 2024-08-16 | 4 | 33.515 | ||||||||||||
2024-08-09 | 15:31:27 | SG | 2024-08-16 | 7 | 34.4841 | Post-Earnings | |||||||||||
2024-08-09 | 14:52:25 | SG | 2024-08-16 | 7 | 34.2855 | Post-Earnings | |||||||||||
2024-08-09 | 14:52:25 | SG | 2024-08-16 | 7 | 34.285 | Post-Earnings | |||||||||||
2024-08-09 | 14:48:10 | SG | 2024-08-16 | 7 | 34.285 | Post-Earnings | |||||||||||
2024-08-09 | 14:09:09 | SG | 2024-08-16 | 7 | 34.365 | Post-Earnings | |||||||||||
2024-08-09 | 13:48:51 | SG | 2024-08-16 | 7 | 33.8794 | Post-Earnings | |||||||||||
2024-08-09 | 13:44:41 | SG | 2024-08-16 | 7 | 33.7554 | Post-Earnings | |||||||||||
2024-08-09 | 13:44:41 | SG | 2024-08-16 | 7 | 33.7554 | Post-Earnings | |||||||||||
2024-08-09 | 13:34:11 | SG | 2024-08-16 | 7 | 33.8495 | Post-Earnings | |||||||||||
2024-08-09 | 13:34:11 | SG | 2024-08-16 | 7 | 33.7851 | Post-Earnings | |||||||||||
2024-08-09 | 13:26:50 | SG | 2024-08-16 | 7 | 33.6599 | Post-Earnings | |||||||||||
2024-08-09 | 13:26:50 | SG | 2024-08-16 | 7 | 33.6599 | Post-Earnings | |||||||||||
2024-08-09 | 13:15:36 | SG | 2024-08-16 | 7 | 33.395 | Post-Earnings | |||||||||||
2024-08-09 | 13:15:36 | SG | 2024-08-16 | 7 | 33.395 | Post-Earnings | |||||||||||
2024-08-09 | 12:50:28 | SG | 2024-08-16 | 7 | 33.66 | Post-Earnings | |||||||||||
2024-08-09 | 12:50:28 | SG | 2024-08-16 | 7 | 33.66 | Post-Earnings | |||||||||||
2024-08-09 | 12:50:28 | SG | 2024-08-16 | 7 | 33.66 | Post-Earnings | |||||||||||
2024-08-09 | 11:36:58 | SG | 2024-08-16 | 7 | 31.8039 | Post-Earnings | |||||||||||
2024-08-09 | 11:36:54 | SG | 2024-08-16 | 7 | 31.76 | Post-Earnings | |||||||||||
2024-08-09 | 10:31:00 | SG | 2024-08-16 | 7 | 33.9199 | Post-Earnings | |||||||||||
2024-08-09 | 10:08:04 | SG | 2024-08-16 | 7 | 33.2132 | Post-Earnings | |||||||||||
2024-08-09 | 10:08:04 | SG | 2024-08-16 | 7 | 33.215 | Post-Earnings | |||||||||||
2024-08-09 | 10:05:07 | SG | 2024-08-16 | 7 | 32.0284 | Post-Earnings | |||||||||||
2024-08-09 | 09:56:49 | SG | 2024-08-16 | 7 | 32.668 | Post-Earnings | |||||||||||
2024-08-09 | 09:56:49 | SG | 2024-08-16 | 7 | 32.665 | Post-Earnings | |||||||||||
2024-08-09 | 09:52:36 | SG | 2024-08-16 | 7 | 33.465 | Post-Earnings | |||||||||||
2024-08-09 | 09:52:36 | SG | 2024-08-16 | 7 | 33.465 | Post-Earnings | |||||||||||
2024-08-09 | 09:52:36 | SG | 2024-08-16 | 7 | 33.465 | Post-Earnings | |||||||||||
2024-08-08 | 12:34:42 | SG | 2024-08-16 | 8 | 25.72 | Pre-Earnings | |||||||||||
2024-08-08 | 12:18:23 | SG | 2024-08-16 | 8 | 25.57 | Pre-Earnings | |||||||||||
2024-08-08 | 10:02:23 | SG | 2024-10-18 | 71 | 24.6809 | Pre-Earnings | |||||||||||
2024-08-07 | 15:36:19 | SG | 2024-09-20 | 44 | 26.005 | ||||||||||||
2024-08-07 | 15:36:19 | SG | 2024-08-16 | 9 | 26.005 | ||||||||||||
2024-08-07 | 15:36:19 | SG | 2024-08-16 | 9 | 26.005 | ||||||||||||
2024-08-07 | 12:30:15 | SG | 2024-08-16 | 9 | 27.16 | ||||||||||||
2024-08-05 | 14:15:00 | SG | 2024-08-16 | 11 | 24.385 | SSR | |||||||||||
2024-08-05 | 14:14:41 | SG | 2024-08-16 | 11 | 24.385 | SSR | |||||||||||
2024-08-05 | 12:46:23 | SG | 2024-08-16 | 11 | 25.0052 | SSR | |||||||||||
2024-08-05 | 12:04:33 | SG | 2024-08-16 | 11 | 24.86 | SSR | |||||||||||
2024-08-05 | 12:00:35 | SG | 2024-08-16 | 11 | 24.8 | SSR | |||||||||||
2024-08-05 | 12:00:36 | SG | 2024-08-16 | 11 | 24.8 | SSR | |||||||||||
2024-08-02 | 15:50:50 | SG | 2024-08-16 | 14 | 26.16 | ||||||||||||
2024-08-02 | 15:50:48 | SG | 2024-08-16 | 14 | 26.16 | ||||||||||||
2024-08-02 | 14:35:37 | SG | 2024-08-16 | 14 | 26.525 | ||||||||||||
2024-08-02 | 12:43:43 | SG | 2024-08-16 | 14 | 26.7337 | ||||||||||||
2024-08-02 | 12:43:43 | SG | 2024-08-16 | 14 | 26.735 | ||||||||||||
2024-08-02 | 11:41:15 | SG | 2024-08-16 | 14 | 26.395 | ||||||||||||
2024-08-02 | 11:41:15 | SG | 2024-08-16 | 14 | 26.395 | ||||||||||||
2024-07-24 | 11:44:30 | SG | 2024-08-16 | 23 | 24.9391 | ||||||||||||
2024-07-24 | 11:44:30 | SG | 2024-08-16 | 23 | 24.94 | ||||||||||||
2024-07-23 | 10:09:48 | SG | 2024-08-16 | 24 | 25.525 | ||||||||||||
2024-07-19 | 15:39:24 | SG | 2024-08-16 | 28 | 24.1597 | ||||||||||||
2024-07-18 | 15:28:25 | SG | 2025-01-17 | 183 | 23.595 | ||||||||||||
2024-07-18 | 14:06:39 | SG | 2024-07-19 | 1 | 23.5237 | ||||||||||||
2024-07-18 | 14:04:22 | SG | 2024-07-19 | 1 | 23.52 | ||||||||||||
2024-07-17 | 12:17:26 | SG | 2024-08-16 | 30 | 25.075 | ||||||||||||
2024-07-12 | 14:57:20 | SG | 2024-07-19 | 7 | 25.215 | ||||||||||||
2024-07-12 | 12:16:36 | SG | 2024-08-16 | 35 | 25.1314 | ||||||||||||
2024-07-12 | 12:16:20 | SG | 2024-08-16 | 35 | 25.02 | ||||||||||||
2024-07-10 | 10:18:40 | SG | 2024-10-18 | 100 | 23.425 | ||||||||||||
2024-07-10 | 10:18:13 | SG | 2024-10-18 | 100 | 23.4649 | ||||||||||||
2024-07-10 | 10:18:13 | SG | 2024-10-18 | 100 | 23.4649 | ||||||||||||
2024-07-09 | 13:19:34 | SG | 2024-07-19 | 10 | 24.435 | ||||||||||||
2024-07-09 | 09:57:21 | SG | 2024-07-19 | 10 | 25.6403 | ||||||||||||
2024-07-08 | 15:29:27 | SG | 2024-08-16 | 39 | 26.3597 | ||||||||||||
2024-07-08 | 12:28:24 | SG | 2024-07-19 | 11 | 26.1803 | ||||||||||||
2024-07-08 | 12:28:24 | SG | 2024-07-19 | 11 | 26.1803 | ||||||||||||
2024-07-05 | 15:06:50 | SG | 2024-07-19 | 14 | 27.5662 | ||||||||||||
2024-07-05 | 10:34:34 | SG | 2024-07-19 | 14 | 28.0364 | ||||||||||||
2024-07-05 | 10:34:17 | SG | 2024-07-19 | 14 | 28.04 | ||||||||||||
2024-07-03 | 11:52:01 | SG | 2025-01-17 | 198 | 28.555 | ||||||||||||
2024-07-02 | 12:33:09 | SG | 2024-07-19 | 17 | 27.7 | ||||||||||||
2024-07-01 | 11:01:52 | SG | 2025-01-17 | 200 | 30.78 | ||||||||||||
2024-07-01 | 11:01:52 | SG | 2025-01-17 | 200 | 30.78 | ||||||||||||
2024-06-28 | 15:51:01 | SG | 2024-08-16 | 49 | 30.265 | ||||||||||||
2024-06-26 | 09:40:20 | SG | 2026-01-16 | 569 | 29.625 | ||||||||||||
2024-06-25 | 15:52:43 | SG | 2025-01-17 | 206 | 29.22 | ||||||||||||
2024-06-25 | 15:41:38 | SG | 2025-01-17 | 206 | 29.06 | ||||||||||||
2024-06-25 | 14:55:59 | SG | 2025-01-17 | 206 | 29.2528 | ||||||||||||
2024-06-25 | 14:43:58 | SG | 2025-01-17 | 206 | 29.302 | ||||||||||||
2024-06-25 | 14:43:58 | SG | 2025-01-17 | 206 | 29.3003 | ||||||||||||
2024-06-25 | 11:41:30 | SG | 2024-07-19 | 24 | 28.97 | ||||||||||||
2024-06-21 | 12:46:11 | SG | 2024-07-19 | 28 | 28.896 | ||||||||||||
2024-06-21 | 12:19:48 | SG | 2024-07-19 | 28 | 28.98 | ||||||||||||
2024-06-20 | 11:44:39 | SG | 2024-07-19 | 29 | 30.22 | ||||||||||||
2024-06-20 | 11:43:33 | SG | 2024-07-19 | 29 | 30.35 | ||||||||||||
2024-06-20 | 11:43:15 | SG | 2024-07-19 | 29 | 30.365 | ||||||||||||
2024-06-13 | 14:22:17 | SG | 2024-07-19 | 36 | 33.9996 | ||||||||||||
2024-06-13 | 09:43:39 | SG | 2024-06-21 | 8 | 34.765 | ||||||||||||
2024-06-13 | 09:36:44 | SG | 2024-06-21 | 8 | 34.9881 | ||||||||||||
2024-06-12 | 10:10:24 | SG | 2024-06-21 | 9 | 34.4 | ||||||||||||
2024-06-11 | 15:36:49 | SG | 2024-06-21 | 10 | 33.545 | ||||||||||||
2024-06-11 | 10:04:06 | SG | 2024-06-21 | 10 | 32.0598 | ||||||||||||
2024-06-11 | 10:04:08 | SG | 2024-06-21 | 10 | 32.215 | ||||||||||||
2024-06-07 | 09:35:02 | SG | 2024-07-19 | 42 | 35.0893 | ||||||||||||
2024-06-05 | 15:25:50 | SG | 2024-06-21 | 16 | 35.62 | ||||||||||||
2024-05-29 | 09:41:38 | SG | 2024-06-21 | 23 | 30.255 | ||||||||||||
2024-05-29 | 09:41:38 | SG | 2024-06-21 | 23 | 30.255 | ||||||||||||
2024-05-29 | 09:41:38 | SG | 2024-06-21 | 23 | 30.255 | ||||||||||||
2024-05-29 | 09:41:38 | SG | 2024-06-21 | 23 | 30.255 | ||||||||||||
2024-05-28 | 12:01:34 | SG | 2024-06-21 | 24 | 32.03 | ||||||||||||
2024-05-21 | 15:17:19 | SG | 2024-06-21 | 31 | 30.6873 | ||||||||||||
2024-05-20 | 11:15:57 | SG | 2024-07-19 | 60 | 33.875 | ||||||||||||
2024-05-20 | 09:35:48 | SG | 2024-06-21 | 32 | 33.1327 | ||||||||||||
2024-05-17 | 10:49:08 | SG | 2024-06-21 | 35 | 31.5996 | ||||||||||||
2024-05-17 | 10:49:08 | SG | 2024-06-21 | 35 | 31.6 | ||||||||||||
2024-05-16 | 15:52:19 | SG | 2024-05-17 | 1 | 31.955 | ||||||||||||
2024-05-16 | 15:52:19 | SG | 2024-05-17 | 1 | 31.955 | ||||||||||||
2024-05-16 | 12:55:04 | SG | 2024-05-17 | 1 | 32.525 | ||||||||||||
2024-05-16 | 10:08:47 | SG | 2024-05-17 | 1 | 32.27 | ||||||||||||
2024-05-16 | 09:59:06 | SG | 2024-05-17 | 1 | 31.985 | ||||||||||||
2024-05-15 | 09:35:50 | SG | 2024-05-17 | 2 | 32.285 | ||||||||||||
2024-05-14 | 09:44:14 | SG | 2024-05-17 | 3 | 32.9499 | ||||||||||||
2024-05-14 | 09:41:22 | SG | 2024-05-17 | 3 | 33.475 | ||||||||||||
2024-05-14 | 09:36:58 | SG | 2024-05-17 | 3 | 33.37 | ||||||||||||
2024-05-13 | 12:12:02 | SG | 2024-05-17 | 4 | 32.545 | ||||||||||||
2024-05-13 | 12:05:07 | SG | 2024-05-17 | 4 | 32.6053 | ||||||||||||
2024-05-13 | 10:11:38 | SG | 2024-05-17 | 4 | 33.22 | ||||||||||||
2024-05-13 | 10:08:42 | SG | 2024-05-17 | 4 | 33.2448 | ||||||||||||
2024-05-13 | 10:08:42 | SG | 2024-05-17 | 4 | 33.2448 | ||||||||||||
2024-05-13 | 10:08:26 | SG | 2024-05-17 | 4 | 33.25 | ||||||||||||
2024-05-10 | 15:50:49 | SG | 2024-05-17 | 7 | 31.6695 | Post-Earnings | |||||||||||
2024-05-10 | 15:49:47 | SG | 2024-05-17 | 7 | 31.605 | Post-Earnings | |||||||||||
2024-05-10 | 15:49:47 | SG | 2024-05-17 | 7 | 31.595 | Post-Earnings | |||||||||||
2024-05-10 | 15:46:51 | SG | 2024-05-17 | 7 | 31.45 | Post-Earnings | |||||||||||
2024-05-10 | 14:44:35 | SG | 2024-05-17 | 7 | 31.0 | Post-Earnings | |||||||||||
2024-05-10 | 12:35:42 | SG | 2024-05-17 | 7 | 31.7513 | Post-Earnings | |||||||||||
2024-05-10 | 10:15:46 | SG | 2025-01-17 | 252 | 33.2781 | Post-Earnings | |||||||||||
2024-05-10 | 09:55:33 | SG | 2024-05-17 | 7 | 33.7442 | Post-Earnings | |||||||||||
2024-05-10 | 09:51:27 | SG | 2024-05-17 | 7 | 32.5544 | Post-Earnings | |||||||||||
2024-05-10 | 09:43:38 | SG | 2024-05-17 | 7 | 32.1239 | Post-Earnings | |||||||||||
2024-05-10 | 09:41:39 | SG | 2024-05-17 | 7 | 32.895 | Post-Earnings | |||||||||||
2024-05-10 | 09:39:01 | SG | 2024-05-17 | 7 | 33.12 | Post-Earnings | |||||||||||
2024-05-10 | 09:36:16 | SG | 2024-05-17 | 7 | 32.8551 | Post-Earnings | |||||||||||
2024-05-10 | 09:36:10 | SG | 2024-05-17 | 7 | 32.8296 | Post-Earnings | |||||||||||
2024-05-10 | 09:35:57 | SG | 2024-05-17 | 7 | 32.52 | Post-Earnings | |||||||||||
2024-05-10 | 09:35:47 | SG | 2024-05-17 | 7 | 32.5664 | Post-Earnings | |||||||||||
2024-05-09 | 15:57:46 | SG | 2024-05-17 | 8 | 23.635 | Pre-Earnings | |||||||||||
2024-05-09 | 15:48:08 | SG | 2024-05-17 | 8 | 23.565 | Pre-Earnings | |||||||||||
2024-05-09 | 15:47:22 | SG | 2024-05-17 | 8 | 23.435 | Pre-Earnings | |||||||||||
2024-05-09 | 13:02:20 | SG | 2025-01-17 | 253 | 23.765 | Pre-Earnings | |||||||||||
2024-05-09 | 13:01:12 | SG | 2025-01-17 | 253 | 23.7 | Pre-Earnings | |||||||||||
2024-05-09 | 13:01:12 | SG | 2025-01-17 | 253 | 23.72 | Pre-Earnings | |||||||||||
2024-05-09 | 13:01:12 | SG | 2025-01-17 | 253 | 23.715 | Pre-Earnings | |||||||||||
2024-05-09 | 12:52:32 | SG | 2024-05-17 | 8 | 23.67 | Pre-Earnings | |||||||||||
2024-05-09 | 12:52:27 | SG | 2024-05-17 | 8 | 23.66 | Pre-Earnings | |||||||||||
2024-05-09 | 12:09:05 | SG | 2025-01-17 | 253 | 23.83 | Pre-Earnings | |||||||||||
2024-05-09 | 11:22:58 | SG | 2025-01-17 | 253 | 23.95 | Pre-Earnings | |||||||||||
2024-05-09 | 11:20:33 | SG | 2025-01-17 | 253 | 23.905 | Pre-Earnings | |||||||||||
2024-05-09 | 11:20:04 | SG | 2025-01-17 | 253 | 23.9 | Pre-Earnings | |||||||||||
2024-05-09 | 11:20:04 | SG | 2025-01-17 | 253 | 23.9 | Pre-Earnings | |||||||||||
2024-05-09 | 11:19:59 | SG | 2025-01-17 | 253 | 23.95 | Pre-Earnings | |||||||||||
2024-05-09 | 11:09:45 | SG | 2024-05-17 | 8 | 23.885 | Pre-Earnings | |||||||||||
2024-05-09 | 11:09:45 | SG | 2024-05-17 | 8 | 23.885 | Pre-Earnings | |||||||||||
2024-05-09 | 10:59:26 | SG | 2024-05-17 | 8 | 23.7893 | Pre-Earnings | |||||||||||
2024-05-09 | 10:59:26 | SG | 2024-05-17 | 8 | 23.79 | Pre-Earnings | |||||||||||
2024-05-09 | 10:46:15 | SG | 2024-07-19 | 71 | 23.63 | Pre-Earnings | |||||||||||
2024-05-08 | 14:59:36 | SG | 2024-06-21 | 44 | 23.34 | ||||||||||||
2024-05-08 | 14:50:35 | SG | 2024-06-21 | 44 | 23.27 | ||||||||||||
2024-05-08 | 14:50:17 | SG | 2024-06-21 | 44 | 23.3 | ||||||||||||
2024-05-07 | 15:33:25 | SG | 2025-01-17 | 255 | 22.835 | ||||||||||||
2024-05-07 | 15:33:25 | SG | 2025-01-17 | 255 | 22.835 | ||||||||||||
2024-05-07 | 15:33:25 | SG | 2025-01-17 | 255 | 22.8505 | ||||||||||||
2024-05-07 | 15:28:32 | SG | 2024-05-17 | 10 | 22.84 | ||||||||||||
2024-05-07 | 15:14:17 | SG | 2025-01-17 | 255 | 22.835 | ||||||||||||
2024-05-06 | 11:56:50 | SG | 2024-05-17 | 11 | 23.1449 | ||||||||||||
2024-05-02 | 10:51:05 | SG | 2024-05-17 | 15 | 20.665 | SSR | |||||||||||
2024-05-02 | 10:13:49 | SG | 2024-05-17 | 15 | 19.535 | SSR | |||||||||||
2024-05-02 | 09:46:46 | SG | 2024-05-17 | 15 | 19.065 | SSR | |||||||||||
2024-05-01 | 15:36:41 | SG | 2024-05-17 | 16 | 20.5 | ||||||||||||
2024-05-01 | 15:36:15 | SG | 2024-05-17 | 16 | 20.51 | ||||||||||||
2024-05-01 | 13:25:26 | SG | 2024-05-17 | 16 | 20.75 | ||||||||||||
2024-05-01 | 13:25:26 | SG | 2024-05-17 | 16 | 20.7696 | ||||||||||||
2024-05-01 | 11:10:10 | SG | 2024-05-17 | 16 | 21.3006 | ||||||||||||
2024-05-01 | 11:08:03 | SG | 2024-05-17 | 16 | 21.37 | ||||||||||||
2024-05-01 | 10:04:34 | SG | 2024-05-17 | 16 | 21.065 | ||||||||||||
2024-05-01 | 10:04:22 | SG | 2024-05-17 | 16 | 21.0699 | ||||||||||||
2024-04-29 | 13:42:56 | SG | 2024-10-18 | 172 | 24.9906 | ||||||||||||
2024-04-29 | 11:02:40 | SG | 2024-05-17 | 18 | 24.525 | ||||||||||||
2024-04-15 | 15:45:35 | SG | 2025-01-17 | 277 | 21.16 | ||||||||||||
2024-04-15 | 15:25:40 | SG | 2025-01-17 | 277 | 21.415 | ||||||||||||
2024-04-11 | 09:50:05 | SG | 2024-04-19 | 8 | 22.66 | ||||||||||||
2024-04-11 | 09:50:05 | SG | 2024-04-19 | 8 | 22.66 | ||||||||||||
2024-04-10 | 09:42:17 | SG | 2024-04-19 | 9 | 22.12 | SSR | |||||||||||
2024-04-09 | 10:47:41 | SG | 2024-05-17 | 38 | 23.0596 | ||||||||||||
2024-04-08 | 11:33:51 | SG | 2025-01-17 | 284 | 25.545 | ||||||||||||
2024-04-08 | 11:33:51 | SG | 2025-01-17 | 284 | 25.545 | ||||||||||||
2024-04-02 | 15:46:11 | SG | 2024-04-19 | 17 | 23.92 | ||||||||||||
2024-04-01 | 13:41:44 | SG | 2024-05-17 | 46 | 25.58 | ||||||||||||
2024-04-01 | 11:48:30 | SG | 2024-05-17 | 46 | 25.7 | ||||||||||||
2024-03-28 | 15:43:13 | SG | 2024-05-17 | 50 | 25.24 | ||||||||||||
2024-03-28 | 12:28:43 | SG | 2024-05-17 | 50 | 25.47 | ||||||||||||
2024-03-28 | 12:28:43 | SG | 2024-05-17 | 50 | 25.47 | ||||||||||||
2024-03-26 | 12:09:42 | SG | 2024-04-19 | 24 | 25.365 | ||||||||||||
2024-03-22 | 15:33:34 | SG | 2025-01-17 | 301 | 24.875 | ||||||||||||
2024-03-22 | 14:55:37 | SG | 2025-01-17 | 301 | 24.825 | ||||||||||||
2024-03-22 | 14:55:37 | SG | 2025-01-17 | 301 | 24.825 | ||||||||||||
2024-03-22 | 12:43:23 | SG | 2024-04-19 | 28 | 24.785 | ||||||||||||
2024-03-22 | 12:36:19 | SG | 2024-04-19 | 28 | 24.71 | ||||||||||||
2024-03-20 | 13:59:12 | SG | 2024-04-19 | 30 | 23.7 | ||||||||||||
2024-03-20 | 11:52:35 | SG | 2024-04-19 | 30 | 23.75 | ||||||||||||
2024-03-20 | 11:52:35 | SG | 2024-04-19 | 30 | 23.785 | ||||||||||||
2024-03-20 | 11:52:35 | SG | 2024-04-19 | 30 | 23.785 | ||||||||||||
2024-03-20 | 11:52:35 | SG | 2024-04-19 | 30 | 23.785 | ||||||||||||
2024-03-20 | 10:48:32 | SG | 2024-04-19 | 30 | 24.4 | ||||||||||||
2024-03-20 | 10:47:58 | SG | 2024-04-19 | 30 | 24.3629 | ||||||||||||
2024-03-20 | 10:47:58 | SG | 2024-04-19 | 30 | 24.3794 | ||||||||||||
2024-03-20 | 10:37:30 | SG | 2024-04-19 | 30 | 24.155 | ||||||||||||
2024-03-20 | 10:22:20 | SG | 2024-04-19 | 30 | 24.035 | ||||||||||||
2024-03-20 | 10:22:20 | SG | 2024-04-19 | 30 | 24.035 | ||||||||||||
2024-03-14 | 11:08:34 | SG | 2024-04-19 | 36 | 21.6245 | ||||||||||||
2024-03-14 | 11:04:59 | SG | 2024-04-19 | 36 | 21.74 | ||||||||||||
2024-03-14 | 10:08:02 | SG | 2024-04-19 | 36 | 21.675 | ||||||||||||
2024-03-13 | 15:40:23 | SG | 2024-04-19 | 37 | 21.3253 | ||||||||||||
2024-03-13 | 15:10:04 | SG | 2024-04-19 | 37 | 21.23 | ||||||||||||
2024-03-13 | 11:45:18 | SG | 2024-04-19 | 37 | 20.69 | ||||||||||||
2024-03-13 | 11:08:57 | SG | 2024-04-19 | 37 | 20.88 | ||||||||||||
2024-03-13 | 09:42:29 | SG | 2024-04-19 | 37 | 20.69 | ||||||||||||
2024-03-12 | 15:20:26 | SG | 2024-04-19 | 38 | 19.71 | ||||||||||||
2024-03-12 | 15:02:56 | SG | 2025-01-17 | 311 | 19.175 | ||||||||||||
2024-03-12 | 10:21:56 | SG | 2024-04-19 | 38 | 19.29 | ||||||||||||
2024-03-08 | 14:14:54 | SG | 2024-03-15 | 7 | 18.74 | ||||||||||||
2024-03-06 | 15:15:22 | SG | 2024-03-15 | 9 | 18.5956 | ||||||||||||
2024-03-06 | 15:15:22 | SG | 2024-03-15 | 9 | 18.5956 | ||||||||||||
2024-03-06 | 13:31:51 | SG | 2024-03-15 | 9 | 18.28 | ||||||||||||
2024-03-06 | 13:31:51 | SG | 2024-03-15 | 9 | 18.28 | ||||||||||||
2024-03-06 | 11:05:02 | SG | 2024-03-15 | 9 | 18.545 | ||||||||||||
2024-03-06 | 11:05:02 | SG | 2024-03-15 | 9 | 18.545 | ||||||||||||
2024-03-06 | 11:05:02 | SG | 2024-03-15 | 9 | 18.545 | ||||||||||||
2024-03-06 | 10:34:36 | SG | 2024-03-15 | 9 | 18.3635 | ||||||||||||
2024-03-06 | 10:07:30 | SG | 2024-03-15 | 9 | 18.5557 | ||||||||||||
2024-03-06 | 09:50:09 | SG | 2024-10-18 | 226 | 18.74 | ||||||||||||
2024-03-06 | 09:50:09 | SG | 2024-10-18 | 226 | 18.74 | ||||||||||||
2024-03-04 | 15:38:37 | SG | 2024-03-15 | 11 | 18.385 | ||||||||||||
2024-03-04 | 15:37:59 | SG | 2024-03-15 | 11 | 18.42 | ||||||||||||
2024-03-04 | 15:37:59 | SG | 2024-03-15 | 11 | 18.42 | ||||||||||||
2024-03-04 | 15:37:59 | SG | 2024-03-15 | 11 | 18.42 | ||||||||||||
2024-03-04 | 15:37:59 | SG | 2024-03-15 | 11 | 18.42 | ||||||||||||
2024-03-04 | 15:20:31 | SG | 2024-07-19 | 137 | 18.35 | ||||||||||||
2024-03-01 | 15:51:31 | SG | 2024-03-15 | 14 | 16.395 | Post-Earnings | |||||||||||
2024-03-01 | 10:47:26 | SG | 2024-03-15 | 14 | 15.925 | Post-Earnings | |||||||||||
2024-03-01 | 10:45:45 | SG | 2024-03-15 | 14 | 15.92 | Post-Earnings | |||||||||||
2024-03-01 | 10:22:03 | SG | 2024-03-15 | 14 | 15.6348 | Post-Earnings | |||||||||||
2024-03-01 | 10:22:03 | SG | 2024-03-15 | 14 | 15.64 | Post-Earnings | |||||||||||
2024-03-01 | 10:22:03 | SG | 2024-03-15 | 14 | 15.6548 | Post-Earnings | |||||||||||
2024-03-01 | 10:22:03 | SG | 2024-03-15 | 14 | 15.6348 | Post-Earnings | |||||||||||
2024-03-01 | 09:30:43 | SG | 2024-03-15 | 14 | 15.906 | Post-Earnings | |||||||||||
2024-02-29 | 15:52:30 | SG | 2024-03-15 | 15 | 12.705 | Pre-Earnings | |||||||||||
2024-02-29 | 15:52:30 | SG | 2024-03-15 | 15 | 12.705 | Pre-Earnings | |||||||||||
2024-02-29 | 13:59:56 | SG | 2024-03-15 | 15 | 12.705 | Pre-Earnings | |||||||||||
2024-02-28 | 15:41:45 | SG | 2024-03-15 | 16 | 12.395 | ||||||||||||
2024-02-28 | 15:27:25 | SG | 2024-03-15 | 16 | 12.375 | ||||||||||||
2024-02-27 | 15:40:49 | SG | 2024-03-15 | 17 | 12.115 | ||||||||||||
2024-02-26 | 12:08:56 | SG | 2024-03-15 | 18 | 11.505 | ||||||||||||
2024-02-08 | 11:18:00 | SG | 2024-02-16 | 8 | 11.79 | ||||||||||||
2024-02-08 | 10:11:50 | SG | 2024-02-16 | 8 | 11.835 | ||||||||||||
2024-01-22 | 10:00:09 | SG | 2024-07-19 | 179 | 10.995 | ||||||||||||
2024-01-22 | 09:59:56 | SG | 2024-07-19 | 179 | 10.9706 | ||||||||||||
2024-01-22 | 09:59:56 | SG | 2024-07-19 | 179 | 10.97 | ||||||||||||
2024-01-22 | 09:59:47 | SG | 2024-07-19 | 179 | 10.9149 | ||||||||||||
2024-01-22 | 09:51:11 | SG | 2024-07-19 | 179 | 10.795 | ||||||||||||
2024-01-17 | 09:33:51 | SG | 2024-02-16 | 30 | 9.92 | ||||||||||||
2024-01-16 | 14:47:49 | SG | 2024-04-19 | 94 | 10.175 | ||||||||||||
2024-01-16 | 14:47:49 | SG | 2024-04-19 | 94 | 10.175 | ||||||||||||
2023-12-06 | 12:45:37 | SG | 2024-01-19 | 44 | 10.755 | ||||||||||||
2023-11-20 | 10:28:37 | SG | 2023-12-15 | 25 | 9.865 | ||||||||||||
2023-11-10 | 13:28:03 | SG | 2024-04-19 | 161 | 8.91477 | ||||||||||||
2023-11-10 | 11:41:01 | SG | 2024-04-19 | 161 | 8.665 | ||||||||||||
2023-11-02 | 12:14:35 | SG | 2023-11-17 | 15 | 11.325 | Pre-Earnings | |||||||||||
2023-10-11 | 14:35:39 | SG | 2024-04-19 | 191 | 10.8953 | ||||||||||||
2023-10-09 | 14:34:12 | SG | 2024-04-19 | 193 | 11.325 | ||||||||||||
2023-10-06 | 10:01:16 | SG | 2023-11-17 | 42 | 11.425 | ||||||||||||
2023-09-22 | 14:19:21 | SG | 2023-11-17 | 56 | 11.485 | ||||||||||||
2023-09-14 | 12:49:00 | SG | 2024-04-19 | 218 | 12.445 | ||||||||||||
2023-09-14 | 12:49:00 | SG | 2024-04-19 | 218 | 12.445 | ||||||||||||
2023-09-14 | 12:44:06 | SG | 2024-04-19 | 218 | 12.435 | ||||||||||||
2023-09-08 | 12:23:39 | SG | 2023-10-20 | 42 | 13.9756 | ||||||||||||
2023-09-01 | 13:19:43 | SG | 2024-01-19 | 140 | 14.35 | ||||||||||||
2023-08-18 | 09:42:00 | SG | 2023-09-15 | 28 | 13.1451 | ||||||||||||
2023-08-08 | 11:14:24 | SG | 2023-09-15 | 38 | 14.315 | ||||||||||||
2023-07-28 | 15:39:06 | SG | 2023-08-18 | 21 | 13.985 | Post-Earnings / SSR | |||||||||||
2023-07-27 | 14:28:53 | SG | 2024-01-19 | 176 | 15.955 | Pre-Earnings | |||||||||||
2023-07-27 | 13:09:26 | SG | 2023-09-15 | 50 | 16.095 | Pre-Earnings | |||||||||||
2023-07-25 | 10:59:16 | SG | 2023-08-18 | 24 | 15.505 | ||||||||||||
2023-07-14 | 11:30:57 | SG | 2023-08-18 | 35 | 15.225 | ||||||||||||
2023-07-14 | 09:54:31 | SG | 2023-10-20 | 98 | 15.425 | ||||||||||||
2023-07-13 | 10:39:47 | SG | 2023-08-18 | 36 | 15.845 | ||||||||||||
2023-07-10 | 09:53:21 | SG | 2023-08-18 | 39 | 14.7448 | ||||||||||||
2023-07-07 | 10:12:37 | SG | 2023-07-21 | 14 | 15.475 | ||||||||||||
2023-07-07 | 09:58:46 | SG | 2023-08-18 | 42 | 15.425 | ||||||||||||
2023-07-07 | 09:53:30 | SG | 2023-08-18 | 42 | 15.545 | ||||||||||||
2023-06-16 | 14:33:46 | SG | 2023-06-16 | 0 | 10.345 | ||||||||||||
2023-06-16 | 10:12:50 | SG | 2023-06-16 | 0 | 10.095 | ||||||||||||
2023-06-15 | 11:32:48 | SG | 2023-07-21 | 36 | 10.975 | ||||||||||||
2023-06-14 | 15:21:31 | SG | 2024-01-19 | 219 | 10.935 | ||||||||||||
2023-06-14 | 15:21:31 | SG | 2024-01-19 | 219 | 10.9354 | ||||||||||||
2023-06-14 | 15:21:31 | SG | 2024-01-19 | 219 | 10.935 | ||||||||||||
2023-06-14 | 14:13:04 | SG | 2023-06-16 | 2 | 10.815 | ||||||||||||
2023-06-14 | 14:12:39 | SG | 2023-06-16 | 2 | 10.775 | ||||||||||||
2023-06-14 | 12:59:56 | SG | 2023-06-16 | 2 | 10.895 | ||||||||||||
2023-06-14 | 12:59:00 | SG | 2023-06-16 | 2 | 10.8548 | ||||||||||||
2023-06-14 | 12:59:00 | SG | 2023-06-16 | 2 | 10.855 | ||||||||||||
2023-06-14 | 12:59:00 | SG | 2023-06-16 | 2 | 10.8548 | ||||||||||||
2023-06-14 | 12:51:51 | SG | 2023-06-16 | 2 | 10.745 | ||||||||||||
2023-06-14 | 11:51:09 | SG | 2024-01-19 | 219 | 10.685 | ||||||||||||
2023-06-14 | 11:51:09 | SG | 2024-01-19 | 219 | 10.685 | ||||||||||||
2023-06-14 | 11:48:08 | SG | 2024-01-19 | 219 | 10.525 | ||||||||||||
2023-06-08 | 13:19:34 | SG | 2023-07-21 | 43 | 10.745 | ||||||||||||
2023-06-05 | 14:19:19 | SG | 2024-01-19 | 228 | 10.575 | ||||||||||||
2023-05-24 | 11:43:08 | SG | 2023-07-21 | 58 | 9.545 | ||||||||||||
2023-05-23 | 12:08:19 | SG | 2023-07-21 | 59 | 9.575 | ||||||||||||
2023-05-23 | 12:08:19 | SG | 2023-10-20 | 150 | 9.575 | ||||||||||||
2023-04-20 | 12:15:53 | SG | 2023-07-21 | 92 | 7.395 | ||||||||||||
2023-04-13 | 13:20:18 | SG | 2023-10-20 | 190 | 7.815 | ||||||||||||
2023-04-11 | 14:04:51 | SG | 2023-04-21 | 10 | 8.065 | ||||||||||||
2023-04-11 | 14:04:51 | SG | 2023-04-21 | 10 | 8.065 | ||||||||||||
2023-03-13 | 10:03:26 | SG | 2023-07-21 | 130 | 7.02 | ||||||||||||
2023-02-27 | 12:34:29 | SG | 2023-03-17 | 18 | 8.94003 | SSR | |||||||||||
2023-02-24 | 11:51:22 | SG | 2023-07-21 | 147 | 9.385 | Post-Earnings / SSR | |||||||||||
2023-02-23 | 14:49:54 | SG | 2023-03-17 | 22 | 9.475 | Pre-Earnings | |||||||||||
2023-02-22 | 13:00:07 | SG | 2023-03-17 | 23 | 9.72 | ||||||||||||
2023-02-06 | 10:05:22 | SG | 2024-01-19 | 347 | 11.235 | ||||||||||||
2023-02-02 | 14:32:31 | SG | 2023-02-17 | 15 | 11.725 | ||||||||||||
2023-01-12 | 09:49:55 | SG | 2023-04-21 | 99 | 9.195 | ||||||||||||
2023-01-04 | 15:26:08 | SG | 2023-02-17 | 44 | 9.065 | ||||||||||||
2022-11-30 | 13:01:44 | SG | 2022-12-16 | 16 | 13.81 | ||||||||||||
2022-11-29 | 13:57:52 | SG | 2022-12-16 | 17 | 13.775 | ||||||||||||
2022-11-29 | 09:53:12 | SG | 2022-12-16 | 17 | 12.9 | ||||||||||||
2022-11-15 | 14:50:03 | SG | 2022-12-16 | 31 | 14.895 | ||||||||||||
2022-11-04 | 12:09:46 | SG | 2022-11-18 | 14 | 17.4 | ||||||||||||
2022-11-04 | 12:05:01 | SG | 2022-11-18 | 14 | 17.165 | ||||||||||||
2022-11-04 | 12:05:01 | SG | 2022-11-18 | 14 | 17.1744 | ||||||||||||
2022-10-24 | 10:49:09 | SG | 2022-11-18 | 25 | 17.81 | ||||||||||||
2022-10-24 | 10:49:09 | SG | 2022-11-18 | 25 | 17.815 | ||||||||||||
2022-08-11 | 12:01:15 | SG | 2022-09-16 | 36 | 18.72 | SSR | |||||||||||
2022-08-11 | 12:01:15 | SG | 2022-09-16 | 36 | 18.72 | SSR | |||||||||||
2022-08-09 | 13:41:26 | SG | 2022-08-19 | 10 | 16.965 | Pre-Earnings |